Bridge J&A for Mini-MACC at Camp Lemonnier, Djibouti

SOL #: JA-2520Justification

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM EUROPE AFRICA CENTRAL
FPO, AE, 09622-0051, United States

Place of Performance

DJIBOUTI, DJ-DJ, Djibouti

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 2, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This Justification and Approval (J&A) authorizes a one-year extension for existing Mini-MACC IDIQ construction contracts managed by NAVFAC Europe Africa Central (EURAFCENT). The extension, from September 27, 2025, to September 27, 2026, ensures continuity of mission-essential construction services at Camp Lemonnier, Djibouti, and other locations. No additional capacity or value is being added to the contracts, which have a remaining capacity of $26,527,034.

Scope of Work

The extended IDIQ contracts cover design-build and design-bid-build construction services. This includes renovation, repair, demolition, waterfront, airfields, and infrastructure projects. The extension is critical for executing various mission-essential projects, such as:

  • Vent Hydrochloric Acid Day Tank
  • Repair Roof Access Ladders
  • Install SCADA for Ring Main Units
  • Retrofit Solar Heat System
  • Install Groundwater Monitoring Wells
  • Upgrade GEN ATS
  • Build Multi-Use PEB
  • Install HVAC System

Contract & Timeline

  • Type: Justification and Approval for IDIQ Extension
  • Duration: One-year extension (September 27, 2025 – September 27, 2026)
  • Value: Remaining contract capacity of $26,527,034
  • Set-Aside: Not applicable for this J&A; the follow-on MACC will be procured under full and open competition.
  • Published: March 2, 2026

Rationale for Extension

The extension is necessary due to insufficient time to solicit and award multiple new stand-alone contracts before the follow-on MACC is awarded. The current contracts provide a streamlined process for urgent construction needs. A Sources Sought notice was posted on SAM.gov on June 25, 2024, but the timeline for a new contract award does not align with early FY26 project requirements. Incumbent contractors are deemed the only sources capable of performing without unacceptable delays.

Impact on Future Competition

The follow-on MACC will be a firm-fixed-price contract procured under full and open competition. The procurement for this follow-on contract is currently in the proposal review stage, with an anticipated award in Q3 FY26.

Additional Notes

The Contracting Officer has determined that projects awarded under this extension will be at a fair and reasonable price. The approved J&A will be posted on SAM.gov within 14 days after the bridge contract award.