Bridgeport Warehouse Snow Damage Repair and Mitigation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service has issued a Combined Synopsis/Solicitation (RFQ) for Bridgeport Warehouse Snow Damage Repair and Mitigation in Mono County, California. This opportunity seeks contractors to construct a new snow canopy and perform repairs to the existing warehouse structure damaged by snow. This is a Total Small Business Set-Aside. Quotations are due by May 1, 2026.
Scope of Work
The project involves:
- Construction of a new snow canopy adjacent to the Bridgeport Warehouse.
- Repairs to damaged roof panels, siding, vents, and flashing.
- Removal and replacement of roof and wall insulation.
- Optional work includes: installation of a concrete slab under the canopy and rerouting of a water supply line if it interferes with footer locations. The place of performance is the Bridgeport Ranger District, Humboldt-Toiyabe National Forest, Mono County, California.
Contract & Timeline
- Contract Type: Single Firm Fixed Price Contract.
- Period of Performance: Work must commence within 10 calendar days of Notice to Proceed, with completion required no later than November 1, 2026. Base quote and options completion time is 75 Calendar Days.
- Response Due: May 1, 2026, 6:00 PM ET.
- Published: April 21, 2026.
Evaluation Criteria
Award will be made to the Lowest Price Technically Acceptable (LPTA) quotation. Technical acceptability will be evaluated based on prior experience with similar projects, specifically in metal building insulation, concrete and rebar installation, structural steel fabrication/installation, and metal roofing. Past performance will also be assessed based on customer satisfaction, timeliness, cost control, business relations, and adherence to contract terms.
Submission Requirements & Key Documents
Offerors must submit a complete quote, including:
- Attachment 3: Schedule of Items (all items priced).
- Attachment 4: Experience Questionnaire (detailing relevant project history and capabilities).
- Acknowledgement of any amendments.
- Fully executed Bid Guarantee (Standard Form 24 and Power of Attorney). Key documents include detailed Drawings (architectural, structural, demolition), Technical Specifications (concrete, metals, insulation, finishes, earthwork), and the Davis-Bacon Act Wage Determination for Mono County, CA. A site visit was held on April 13, 2026, and a Q&A document clarified the stability of the saw shop interior roof.
Contact Information
For questions, contact Tony Taylor, Contract Specialist, at tony.taylor@usda.gov.