Buckley SFB - B205 Boiler Exhaust Venting Replacement

SOL #: FA254326Q0004Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA2543 460 CONS
BUCKLEY AFB, CO, 80011-9572, United States

Place of Performance

Aurora, CO

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 17, 2026
2
Submission Deadline
Apr 20, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 460 CONS, is soliciting quotes for Boiler Exhaust Venting Replacement services at Building 205, Buckley Space Force Base (SFB), Aurora, CO. This Total Small Business Set-Aside opportunity requires the replacement of deteriorating boiler venting to ensure proper system operation and occupant safety. Quotes are due by April 20, 2026, 5:00 PM MST.

Purpose & Scope

This combined synopsis/solicitation (RFQ FA254326Q0004) seeks a contractor to remove and replace the existing deteriorating boiler venting (exhaust & inlet) for four Lochinvar boilers (two domestic hot water, two heating) in Building 205. The objective is to mitigate ongoing condensate leaks, prevent system failure, and avoid the release of hazardous flue gases, thereby ensuring proper system operation and occupant safety.

Key Requirements

The contractor shall:

  • Replace exhaust and air intake vent piping for four Lochinvar boilers in Building 205.
  • Adhere to manufacturer installation manuals and specified codes (e.g., UFC 3-410-01, OSHA 1926.55, NFPA 101, International Mechanical Code).
  • Perform inspections, comprehensive leak checks, draft analysis, and combustion analysis on all boilers.
  • Coordinate final inspection with the Fire Department and recommission systems.
  • Deliver a deficiency report and provide all necessary new, unused, and non-refurbished materials (e.g., CPVC vent piping).
  • Dispose of all removed parts and materials off-site.
  • Ensure contractor employees pass background checks for installation access.
  • Utilize technicians certified and licensed for Lochinvar commercial boilers.

Contract Details

  • Contract Type: Fixed-Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J045 (Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment)
  • Period of Performance: 60 calendar days after receipt of award
  • Place of Performance: Building 205, 606 S. Aspen St., Buckley SFB, Aurora, CO 80011

Submission & Evaluation

  • Submission Deadline: Monday, April 20, 2026, by 5:00 PM MST.
  • Submission Method: Email quotes to TSgt Matt Kennedy (matthew.kennedy.24@spaceforce.mil) and SSgt Cody Wolff (cody.wolff@spaceforce.mil).
  • Required Items: Quote, technical description of SOW compliance, warranty details, company information, CAGE Code, and/or UEI number.
  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA). Offers will be evaluated on Price and Technical capability, which must demonstrate the ability to perform all requirements within the 60-day period. Technical factors, when combined, are approximately equal to price. Offerors must be registered in SAM.

Points of Contact

People

Points of Contact

Files

Files

Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
Buckley SFB - B205 Boiler Exhaust Venting Replacement | GovScope