Building 1005 and 1005F Painting Project
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for the Building 1005 and 1005F Painting Project at Marine Corps Base Camp Lejeune, NC. This is a Combined Synopsis/Solicitation under a Total Small Business Set-Aside, specifically for pre-qualified M&R MACC Contractors. The project involves comprehensive exterior painting, including lead-based paint encapsulation. Proposals are due June 4, 2026, at 2:00 PM EST.
Scope of Work
This project requires the contractor to furnish all labor, materials, equipment, and supervision for a comprehensive painting project for Building 1005 (estimated 22,000 SF walls, 15 doors) and Building 1005F (estimated 800 SF walls, 2 doors) at Michael Road, Hadnot Point Industrial Area. Key tasks include:
- Complete surface preparation, cleaning, and application of specified coating systems.
- Repair of surface and substrate deficiencies (cracks, spalls, holes).
- Removal of non-adherent existing coatings and feathering of sound coatings.
- Mechanical abrasion of glossy surfaces.
- Encapsulation of existing lead-based paint (not full abatement), complying with 29 CFR 1926.62.
- Replacement of deteriorated exterior joint sealants.
- Application of primers and coatings per manufacturer's instructions and "SECTION 09 90 00 - PAINTS AND COATINGS" specifications.
- Replication of existing stenciled signage and re-establishment of markings on exposed piping.
- Contractor must field-verify all quantities and dimensions. The facility will remain operational, requiring minimal interference.
Contract Details
- Contract Type: Combined Synopsis/Solicitation (Firm Fixed-Price anticipated).
- Estimated Value: Between $100,000 and $250,000.
- Period of Performance: 180 days after award.
- Liquidated Damages: $220 per Calendar Day for delays.
- Basis for Award: Lowest Price.
- Proposal Acceptance Period: 60 days from receipt of offers.
Eligibility & Submission
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Eligibility Restriction: ONLY M&R MACC Contractors listed on the General Requirements cover page may submit a proposal. Specifically, the RFP lists: T.E. Davis Construction Company, Joyce & Associates Construction, Inc., Olympic Enterprises, Inc., and Quadrant Construction.
- Proposal Due Date: June 4, 2026, at 2:00 PM EST.
- Proposal Submission: Via email to kelly.j.cannon4.civ@us.navy.mil and regenia.d.guest.civ@us.navy.mil.
- Requests for Information (RFIs) Cut-off: May 25, 2026, 3:00 PM EST.
- Site Visit: A site visit was held on May 12, 2026, at 0900.
- Bond Requirements: Payment bond required for proposals $35K+, Bid, Payment, and Performance bonds for proposals $150K+. Bid bonds must be 20% of proposal amount.
- Contacts: Kelly Cannon (kelly.cannon@navy.mil) and Regenia D. Guest (regenia.d.guest.civ@us.navy.mil, 9104515816).
Key Documents & Requirements
Bidders must adhere to the "Marine Corps Base (MCB) Camp Lejeune Contractor Environmental Guide" (Version 3, March 2016) and "SECTION 09 90 00 - PAINTS AND COATINGS" specifications. Compliance with all federal, state, and local environmental laws, EM 385-1-1, and site-specific regulations is mandatory. This includes procedures for hazardous materials (e.g., lead-based paint), site access (DBIDS/One-Day Passes), and Unexploded Ordnance (UXO) awareness training for ground-disturbing activities. One person may fulfill Superintendent, Quality Control Manager, and Safety & Health Officer roles if qualified. Offerors must acknowledge all amendments.