Building 17W Loading Dock Slab Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The purpose of this amendment is to:1. Provide a revised Statement of Work as an attachment, 2. Add an additional site visit for Monday, 02 June at 1100, with PPI due date 06 June, 3. Proposal due date is extended to 13 JUNE 2025. Design-Build project to design and install a replacement reinforced loading dock slab at on the south side of Building 17W. The existing load dock slab has extensive signs of damage on the underside including spalling concrete, concrete cracks, efflorescence, and exposed, corroded reinforcing steel. Repairs shall correct existing issues to return the slab to its original condition.