BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS

SOL #: W519TC26Q8009Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

IL

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 12, 2026
2
Response Deadline
Mar 18, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, specifically W6QK ACC-RI at Rock Island Arsenal, IL, is conducting market research through a Sources Sought notice for BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS. This opportunity seeks qualified vendors to perform detailed electrical infrastructure work, including the relocation of bus ducts, conduits, and communication cables within Building 299, Zone 8. This is for market research only, and no site visits are scheduled at this time. Responses are due by March 18, 2026.

Scope of Work

The primary objective is to relocate three existing bus ducts and multiple conduits and communication cables within Building 299, Zone 8, moving them closer to the building roof trusses. Key tasks include:

  • Bus Duct Relocation:
    • Relocate a 1200-amp Square D, I-Line bus duct approximately 300 feet, including a 50-foot extension and provision of specific bus plugs.
    • Relocate an 800-amp Siemens, Spectra series bus duct approximately 110 feet, with potential modifications for crane installation.
    • Relocate a second 800-amp Siemens, Spectra series bus duct from Zone 6 to Zone 8, approximately 110 feet, including a 40-foot extension and provision of specific bus plugs.
  • Conduit and Cable Relocation: Move various conduits and communication lines in Zone 8 above heaters and closer to roof trusses in specified areas.
  • Removal: Remove drop cords, associated supporting items, electrical bus sections, and a large junction box protruding into the high bay area.
  • General Requirements: Provide all necessary conductors, conduits, support systems, bus ducts, bus plugs, and hardware. Verify wiring and power availability in new locations. Install conduits as close to roof trusses as possible.

Performance Standards & Special Requirements

Work must conform to applicable local, federal codes, and national standards (e.g., National Electrical Codes). All equipment must be new and unused. Contractors are responsible for site inspections and measurements. Strict adherence to Rock Island Arsenal security protocols (background checks, FPCON, RAMP, Anti-Terrorism Level I, iWatch training) and OSHA/RIA safety standards is mandatory. Real ID will be required for entry starting May 3, 2025. RIA will provide utilities to the first connection point, and contractors are responsible for anchoring mechanisms. Complete documentation packages are required upon completion, with final acceptance contingent on successful performance testing and government inspection.

Contract & Timeline

  • Opportunity Type: Sources Sought (Market Research)
  • Product Service Code: Y1PZ - Construction Of Other Non Building Facilities
  • Set-Aside: None specified
  • Response Due: March 18, 2026, 7:00 PM ET
  • Published: March 12, 2026, 5:49 PM ET
  • Place of Performance: Building 299, Zone 8, Rock Island Arsenal, IL 61299

Additional Notes

This notice is for market research only. Interested vendors should provide their name, CAGE, business size, and a capability statement. No site visits are available at this time. Contact JOHN JACOBSEN at JOHN.E.JACOBSEN16.CIV@ARMY.MIL for inquiries.

People

Points of Contact

JOHN JACOBSENPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Sources Sought
Posted: Mar 12, 2026
BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS | GovScope