Building F20016 Furniture, Project 2026SH026
SOL #: FA860126Q0046Combined Synopsis/Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Air Force
FA8601 AFLCMC PZIO
WRIGHT PATTERSON AFB, OH, 45433-5344, United States
Place of Performance
Wright Patterson AFB, OH
NAICS
Office Furniture (except Wood) Manufacturing (337214)
PSC
Office Furniture (7110)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
May 7, 2026
2
Submission Deadline
May 22, 2026, 8:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, AFLCMC/PZI Installation Contracting Support, is seeking proposals for Building F20016 Furniture, Project 2026SH026 at Wright-Patterson Air Force Base, OH. This is a Combined Synopsis/Solicitation (RFQ FA860126Q0046) for a Firm Fixed-Price (FFP) contract to procure and install furniture, flooring, and related design services. This opportunity is a 100% Small Business Set-Aside. Quotes are due May 22, 2026, at 4:00 PM EST.
Scope of Work
The contractor will provide and install a comprehensive furniture package for Facility 20016, Area B. Key deliverables include:
- Furniture: Mid-back conference chairs, mesh back guest chairs, poly breakroom chairs, various conference and breakroom tables, buffet credenzas, mobile computer carts, shelf partitions, and magnetic glass boards.
- Flooring: Interface Open Air Collection carpet and Interface Brushed Lines luxury vinyl tile (LVT).
- Services: Design services (including 3D renderings, AutoCAD, space planning, material selection, and up to three revisions), project management, site visits, field measurements, 30 days of storage, freight, receiving, delivery, and installation.
- Ancillary: Repair or replacement of any flooring and ceilings damaged during furniture installation. Products should generally be from a single manufacturer. Installation must be performed by manufacturer-certified professionals.
Contract Details
- Contract Type: Firm Fixed Price (FFP)
- Period of Performance: Delivery and installation are required within 160 days After Receipt of Order (ARO).
- Set-Aside: 100% Small Business Set-Aside under NAICS 337214 (Office Furniture Manufacturing) with a size standard of 1100 employees.
- Place of Performance: Facility 20016, Area B, 2275 D Street, Wright-Patterson Air Force Base, OH 45433.
Submission & Evaluation
- Questions Due: May 15, 2026, at 4:00 PM EST. Submit questions via email to both contacts.
- Quotes Due: May 22, 2026, at 4:00 PM EST.
- Submission Method: Electronically via a single email (max 5MB) to Nasir Rashid (nasir_al-din.rashid.1@us.af.mil) and Claire Hess (claire.hess@us.af.mil). The subject line must be "FA860126Q0046, Furniture F20016 Project 2026SH026". Only .pdf, .doc, .docx, .xls, or .xlsx attachments are permitted.
- Evaluation Criteria: Award will be made to the responsible offeror submitting the Lowest Price Technically Acceptable (LPTA) quotation. Quotes must conform to requirements, comply with the SOW, and include a complete description of the equipment provided. Quotes with only pricing will not be accepted.
- Price Validity: Offerors must hold prices firm for 120 calendar days.
Mandatory Requirements
- SAM Registration: Offerors must be registered in SAM.gov.
- CMMC Level 1: A mandatory Cybersecurity Maturity Model Certification (CMMC) Level 1 Assessment is required. Offerors must be fully compliant, and assessment results must be recorded in the Supplier Performance Risk System (SPRS) module of PIEE.
- Carpet Procurement: Bidders must follow instructions in the "Optional Carpet BPA Instructions" attachment for obtaining carpet quotes from approved Tier 1 manufacturers and negotiating Tier 2 installation costs.
People
Points of Contact
Nasir RashidPRIMARY
Claire HessSECONDARY
Files
Versions
Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 7, 2026