Building FC478 and FC481 Paint and Flooring Repairs

SOL #: N4008526R9037Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 1, 2026
2
Submission Deadline
Jun 1, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Building FC478 and FC481 Paint and Flooring Repairs at Marine Corps Base Camp Lejeune, NC. This Combined Synopsis/Solicitation is a Total Small Business Set-Aside and is restricted to M&R MACC Contractors listed on the General Requirements cover page. The project involves comprehensive interior and exterior renovations to ensure facility upkeep and operational readiness. Proposals are due June 01, 2026, at 2:00 PM EST.

Scope of Work

The project encompasses extensive paint and flooring repairs for Buildings FC478 and FC481. Paint Repairs: Includes surface preparation, painting of all previously painted interior and exterior surfaces (walls, doors, frames, windows), repair of cracks/holes, mold treatment, replacement of damaged trim/caulking, and application of specified primers (latex KILZ 2) and finish paints (latex semi-gloss, eggshell/satin, high gloss). Special attention is given to bathroom areas and the encapsulation of existing lead paint. Work requires careful coordination as approximately half of the work areas will be available at a time, and existing morals/artwork must be preserved. Flooring Repairs: Involves the removal of existing flooring and installation of new Luxury Vinyl Tile (LVT) in sleeping rooms and Epoxy Resinous Flooring in shared/common spaces, lounges, and stairwells. All flooring surfaces must be free of previous adhesives, and LVT surfaces sealed. Existing transition strips and rubber cove base will be replaced. The contractor is responsible for moving and resetting furniture.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation
  • Estimated Cost Range: Between $1,000,000 and $5,000,000
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Eligibility: Restricted to M&R MACC Contractors
  • Completion Period: 540 days after award
  • Liquidated Damages: $880 per Calendar Day
  • Place of Performance: Marine Corps Base Camp Lejeune, NC

Key Requirements & Specifications

The facilities will remain operational throughout the construction period, requiring minimal interference with normal activities. Bidders must adhere to detailed product specifications for paints (e.g., Benjamin Moore, Sherwin Williams) and flooring (e.g., Mannington, Dur-a-flex), ensuring compliance with industry standards (ASTM, MPI, SSPC) and indoor air quality certifications. A hazardous materials plan for lead work is required. Contractors must also comply with the "Contractor Environmental Guide" for MCB Camp Lejeune. One individual may fulfill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer if qualified. Submittal registers outline extensive post-award documentation requirements.

Submission & Evaluation

  • Proposal Due Date: June 01, 2026, 2:00 PM EST
  • Requests for Information (RFIs) Cut-off: May 18, 2026, 3:00 PM EST
  • Site Visit: May 07, 2026, at 1300, meeting at FC481.
  • Submission Email: edward.e.pelser.civ@us.navy.mil and regenia.d.guest.civ@us.navy.mil
  • Basis for Award: Lowest Price
  • Proposal Acceptance Period: 60 days from receipt of offers
  • Note: Funding is contingent, and no award will be made if funds are unavailable.

Points of Contact

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 1, 2026
Building FC478 and FC481 Paint and Flooring Repairs | GovScope