Buildings RR139, RR140, and RR141 Paint and Flooring Repairs

SOL #: N4008526R9038Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 1, 2026
2
Last Updated
May 28, 2026
3
Submission Deadline
Jun 2, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for Paint and Flooring Repairs for Buildings RR139, RR140, and RR141 at Camp Lejeune, NC. This project involves comprehensive interior and exterior surface preparation, painting, and flooring replacement. This is a Total Small Business Set-Aside, with eligibility restricted to specific M&R MACC Contractors. Proposals are due June 02, 2026, at 2:00 PM EST.

Scope of Work

The project encompasses extensive paint and flooring repairs across three buildings. Painting tasks include preparing, painting, and repairing interior and exterior walls, doors, door frames, and window frames. This involves repairing cracks, holes, treating mold/mildew, and encapsulating existing lead paint (not abatement). Flooring work requires removing existing flooring and installing new Luxury Vinyl Tile (LVT) in sleeping rooms and Epoxy Resinous Flooring in shared/common spaces, lounges, corridors, and stair areas. The contractor is responsible for moving furniture, field verifying measurements, and ensuring minimal interference as facilities will remain operational throughout the construction period. All work must comply with attached painting, coating, and resilient flooring specifications.

Contract & Timeline

This is a Combined Synopsis/Solicitation (RFP) for a project with an estimated cost range of $1,000,000 to $5,000,000. The contract completion date is 730 days after award, as updated by Amendment 0002. Liquidated damages are set at $880 per calendar day. Award will be based on the Lowest Price. Proposals will be accepted for 60 days from receipt.

Eligibility & Submission

This opportunity is a Total Small Business Set-Aside (FAR 19.5). Only the following M&R MACC Contractors are eligible to submit a proposal: T.E. Davis Construction Company, Joyce & Associates Construction, Inc., Olympic Enterprises, Inc., and Quadrant Construction. Proposals must be emailed to edward.e.pelser.civ@us.navy.mil and regenia.d.guest.civ@us.navy.mil by the deadline. Requests for Information (RFIs) were due by May 19, 2026, 3:00 PM EST. A site visit was rescheduled to May 11, 2026, at 0930 at Building RR139. Bond requirements vary by proposal value: payment bond for proposals $35K+, and bid, payment, and performance bonds for proposals $150K+.

Amendments & Notes

Amendment 0001 rescheduled the site visit. Amendment 0002 extended the contract duration to 730 days and clarified flooring types (LVT for sleeping rooms, Epoxy for common areas/corridors/stairs). Amendment 0003 updated the General Decision Number for wage rates. Offerors must acknowledge all amendments with their proposal. Funding may not become available, and no award will be made if funds are not available; offerors will not be reimbursed for proposal costs.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 28, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 28, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 7, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Buildings RR139, RR140, and RR141 Paint and Flooring Repairs | GovScope