Burnsville Rip Rap

SOL #: W9123725QA054Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST HUNTINGTON
HUNTINGTON, WV, 25701-5000, United States

Place of Performance

Place of performance not available

NAICS

Cut Stone and Stone Product Manufacturing (327991)

PSC

Mineral Construction Materials, Bulk (5610)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Aug 14, 2025
2
Submission Deadline
Aug 21, 2025, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Contractor shall provide all labor, equipment, and materials required to deliver Stone within 30 days post award, to U.S. Army Corps of Engineers Burnsville Lake Project. Contractor shall notify the government point of contact 5 business days prior to delivery to allow time for the project to get equipment rented to place the stone. The stone being delivered to Falls Mill will need to be delivered on a schedule to reduce the stone having to be rehandled. A maximum of four truck loads can be delivered per day. Two trucks can be delivered between 0800 ? 1000 Eastern Time and the other two trucks can be delivered between 1130 ? 1330 Eastern Time. Delivery to Bulltown Campground shall be scheduled between hours 0800-1430 Eastern Time but does not have a quantity limit per day. All Rip-Rap stone must be clean and meet West Virginia Department of Transportation requirements of the 2000 Standard Specifications, and the 2009 Supplement Standard Specifications under Section 704.2 ? ?Stone For Riprap?. Stone for riprap shall consist of field stone or rough unhewn quarry stone as nearly rectangular in section as is practicable. The material shall have a maximum weighted loss of 30 percent when subjected to five cycles of sodium sulfate soundness test. A letter must be provided prior to delivery stating the Rip Rap meets the specifications. Stone Quantity and Type: 1. 500 Tons of 12?24-inch Rip Rap delivered to Falls Mill2. 50 Tons of 3-inch crusher Run delivered to Falls Mill3. 250 Tons of 6?12-inch Rip Rap delivered to Bulltown Campground 4. 400 Tons of 57 clean gravel delivered to Bulltown Campground