BUTLER HIGH SPEED TIP GRINDER PM/RM
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, specifically AFSC PZIMC at Tinker AFB, OK, has issued a combined synopsis/solicitation (FA813226Q0045) for Preventive Maintenance (PM) and Remedial Maintenance (RM) services for the Butler Newall High Speed Blade Tip Grinder. This is a Sole Source acquisition for a Firm Fixed Price (FFP) contract. Quotes are due by July 7, 2026, at 12:00 PM (Noon) Daylight Savings Time.
Scope of Work
The contractor will provide all necessary labor, tools, equipment, and materials to perform:
- Two (2) Preventive Maintenance (PM) inspections per year on each grinder, adhering to OEM specifications.
- Remedial Maintenance (RM) for equipment breakdowns or malfunctions, with a response time of within two (2) business days on-site after work request approval.
- Services include electrical/electronic systems inspection, mechanical systems inspection, calibration, lithium backup battery changes, and UPS voltage checks.
- All work must comply with manufacturer specifications and the provided Performance Work Statement (PWS).
Contract & Timeline
- Contract Type: Firm Fixed Price (FFP)
- Period of Performance: One (1) Base Year (estimated 01 NOV 2026 - 31 OCT 2027) with four (4) Option Years.
- Place of Performance: Oklahoma City-Air Logistics Complex (OC-ALC), Tinker AFB, OK.
- Set-Aside: Sole Source
- NAICS Code: 811310 (size standard $12.5M)
- Quotes Due: July 7, 2026, 12:00 PM (Noon) DST
- Published Date: June 18, 2026
Evaluation
Award will be made to the responsible Offeror whose quote conforms to the solicitation and is most advantageous to the Government. Evaluation will consider quote completeness, price reasonableness, and cost realism. Quotes must be valid for at least 90 days.
Additional Notes
- Offerors must be registered in SAM.gov prior to quoting.
- Quotes must be submitted via email to Bridgette Miles (bridgette.miles@us.af.mil) or Tran Walsh.
- The contractor must provide a PM schedule within ten (10) business days of award and notify the GPOC seven (7) business days prior to each PM visit.
- Invoices must be submitted through Wide Area Workflow (WAWF).
- Adherence to safety, environmental compliance, and security requirements is mandatory. Contractor personnel must be qualified, with OEM experience, and complete required training.