BWDS-90 Antenna Repair Georgia Emergency Management Agency

SOL #: WX00350Y2026TCombined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Federal Emergency Management Agency
NATIONAL CONTINUITY SECTION(CON50)
BERRYVILLE, VA, 22611, United States

Place of Performance

Atlanta, GA

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Antennas, Waveguide, And Related Equipment (5985)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 9, 2025
2
Last Updated
Dec 23, 2025
3
Submission Deadline
Dec 26, 2025, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Ammendment: Questions and Answers: 

Is there access to the antenna location to be able to have a drive-able man lift delivered by a rental company, and would the man lift have access to all three current wood poles to effect the repairs? Yes 

- Can you confirm the contractor after installation will not be responsible for antenna RF propagation or area of coverage due to the required dipole modifications and installation per SOW? Yes

- In the SOW, under "Specific Section" 3(b),  I assume "Guy Cable" refers to individual dipole suspension lines. Yes

- What size Phillystran will FEMA provide, HPTG-1200I (.17" Diameter) ? 1/4 inch

- Reference section 3(c), what kind of spacers will FEMA provide to be placed every 20ft on the suspension lines? OEM ceramic spacers 

  And, will the original OEM ceramic spacers be used to secure the dipole elements to the center eyelets nearest the antenna balun? Yes 

You are requested to provide firm-fixed pricing for the services specified in the Statement of Work (SOW).  Funding has been obtained for this proposed procurement in an amount equal to or greater than the Independent Government Cost Estimate (IGCE).  The Government requests pricing for the services listed in the SOW to be in effect for thirty (30) days after the date of your RFQ response.  Award will be made to the lowest priced, technically acceptable proposal. The technical approach should not include prices. The price breakdown should be provided as a separate document.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Dec 23, 2025
Version 2
Combined Synopsis/Solicitation
Posted: Dec 11, 2025
View
Version 1
Combined Synopsis/Solicitation
Posted: Dec 9, 2025
View
BWDS-90 Antenna Repair Georgia Emergency Management Agency | GovScope