C-5 Honeycomb Contract Strategy

SOL #: C-5-Honeycomb-Contract-StrategySources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
F3YCCF 448 SCMW
TINKER AFB, OK, 73145-0000, United States

Place of Performance

S Coffeyville, OK

NAICS

No NAICS code specified

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Mar 4, 2026
2
Response Deadline
Mar 26, 2026, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is conducting a Sources Sought for a C-5 Honeycomb Contract Strategy, focusing on the complex manufacturing of adhesive bonded honeycomb panels for the C-5 Galaxy aircraft. This effort aims to identify qualified sources for these critical structural components. Responses are due March 26, 2026.

Scope of Work

The C-5 Galaxy aircraft relies on specialized adhesive bonded honeycomb panels to provide aerodynamic contours and structural integrity. Manufacturing these panels demands strict control over facility contamination levels, building temperature/humidity, adhesive life tracking, autoclave operation, and bond line surface preparations. The process follows detailed processing specifications, often requiring experienced technical staff to interpret aircraft loft data for highly contoured areas.

This Sources Sought is specifically for a Source Qualification Statement (SQS), as detailed in the document "C-5 Honeycomb Panels SQS for Industry Day.pdf". The SQS outlines the requirements for potential vendors to become qualified sources for manufacturing these panels.

Qualification Requirements

The SQS details the justification for establishing a qualification requirement, the specific technical, manufacturing, quality assurance, and experience requirements that must be met. Bidders must thoroughly review Section C of the SQS to understand the necessary capabilities, documentation, and processes required for qualification. Appendices A and B list specific part numbers and currently qualified manufacturers, respectively, providing context for the scope of this qualification.

Contract & Timeline

  • Type: Sources Sought
  • Response Due: March 26, 2026
  • Published: March 4, 2026
  • Set-Aside: None specified
  • Place of Performance: S Coffeyville, OK, United States

Purpose

This notice is critical for any vendor interested in manufacturing C-5 honeycomb structural panels, as it defines the pathway to becoming an approved and qualified source. It is for market research and qualification purposes only and does not constitute a solicitation for proposals.

Contact Information

People

Points of Contact

Tracey BeringerPRIMARY
Tracey BeringerSECONDARY

Files

Files

Download

Versions

Version 1Viewing
Sources Sought
Posted: Mar 4, 2026
C-5 Honeycomb Contract Strategy | GovScope