C--AITC Electrical Engineering Study - Grounding Study and Design (VA-19-00069954)

SOL #: 36C10X19Q0237Combined Synopsis/Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
SAC FREDERICK (36C10X)
FREDERICK, MD, 21703, United States

Place of Performance

Place of performance not available

NAICS

Administrative Management and General Management Consulting Services (541611)

PSC

Architect/Engineer Services (C)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 3, 2019
2
Last Updated
Sep 4, 2019
3
Submission Deadline
Sep 3, 2019, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the

offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not,

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter

or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to

the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print)

(Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign)

(Signature of Contracting Officer)

1

4

0003

09-04-2019

None

36C10X

Strategic Acquisition Center - Frederick

Department of Veterans Affairs

5202 Presidents Court, Suite 103

Frederick MD 21703

36C10X

Strategic Acquisition Center - Frederick

Department of Veterans Affairs

5202 Presidents Court, Suite 103

Frederick MD 21703

To all Offerors/Bidders

36C10X19Q0237

X

X

X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 9:00 AM EST, 09/09/2019

See CONTINUATION Page

X

The purpose of this amendment is to:

1. Provide answers to questions.

See following page.

Questions and Answers (and Attachments)

Is the scope of this analysis to include the data center area in Exhibit B only, or the balance of the facility as well?Â

The entire facility outlined in ORANGE in Exhibit A represents the extent of the grounding design study.

How many levels in the facility?Â

3 Floors and a Diesel Generator/Storage Tank Yard.

What is total square footage of the area to be included in the scope of the analysis?

4. How many electric utility services?

There are two redundant 12.5kV feeders connected to two Automatic Throw Over (ATO) Switches.  These ATOs feed three Power and Distribution System for the VA Facility.  The facility and Data Center Power System A shares three 2MVA transformers in one electrical service room internal to the Facility.  Power System B has two redundant 2.5MVA transformers and Power System C has two redundant 2.5 MVA transformers.

How many standby generators?

Four diesel generators on Power System A.  Two diesel generators on Power System B. And soon to be installed, two diesel generators on Power System C.

Will it be possible to shut down main service switchboards/switchgear and generators to allow for inspection of internal grounding/bonding connections?

On a case by case basis only.

Are facility drawings such as electrical one-lines, floor plans, grounding details available?  If so, in what electronic format?Â

Existing electrical one-line diagram (23-Aug-16) has errors and is out-of-date.  A new Electrical One-Line Diagram (red line one-line diagram) was started but only got to about 35% complete.  Both are attached.

Section 2.4 mentions some electrical engineering tools and test equipment at site that may be used, if necessary.  Can you provide specific information on what is available?

3PH Power Quality Logger, Multimeters, and 3x HRC 4 PPE Suits and glove kits.

Section 3.1 mentions possibility of limited access to certain areas.  Are any of these areas included in the portion of the facility where the grounding analysis will focus?

Yes, computer, electrical, and telecom room access is restricted.  Security background checks and acknowledgement of rules of behavior must be accomplished first before contractor work can be performed.Â

Can you provide more details about limited access i.e., is access limited to outside of normal business hours, during certain times of each month, etc.?Â

All contractor work shall be performed on a non-interference basis to daily Data Center Operations (Computer, Electrical, Telecom rooms, and Generator/Tank Yard/Alleyway). Visual inspections are allowed in these rooms during normal business hours as well as other assessment activities based upon prior VA approval.  De-energizing/re-energizing system equipment work may need to be performed after hours.  Contractor work to be performed on the Facility (non-Data Center Operations) shall be accomplished during normal business hours unless required after hours by the VA.  A contractor planning and scheduling for all work shall be approved prior to start work at the facility. Â

New Amendment lists Item A.1 Price/Cost Schedule and A.2 Delivery Schedule. But original RFQ document lists B.3 Price/Cost Schedule with no. of items, which is quite different than posted in amendment. Please clarify which price/cost schedule to be submitted? Are we required to provide total fees of entire scope of work described in this RFQ?

Please use B.3 in the original RFQ when submitting pricing. Yes, please submit pricing for entire scope of work described in the RFQ.

Could we get a copy of the As Built/Record copy of the existing electrical system on line diagram for us to estimate the effort for grounding study and design?

See attachment below. Existing electrical one-line diagram (23-Aug-16) has errors and is out-of-date.

Is electronic submission of this offer acceptable?

Yes.

According to RFQ paragraph 2.5, all engineers are required to be a professional engineer licenses by Texas Board. Our engineers are currently not licensed by Texas board but by several other states. However, if we become successful awardee for this RFQ, we will obtain our Professional Engineer licenses by reciprocity method allowed by Texas board of professional engineer. Please confirm that this will be acceptable in evaluation of our proposal.

YES, if reciprocity can be achieved prior to first submittal and all submitted plans, specifications, drawings, and reports associated with this project are signed by an actively licensed electrical PE with Texas stamp.

In the Cost Schedule at B.3 are we to provide one-unit price number only or rates and hours by the disciplines provided in each box? The confusion comes from the listing of disciplines within each block but just one line. A simple, single lump sum for each CLIN would be easiest.

Yes, a single lump sum for reach CLIN is acceptable.

ATTACHMENTS:

People

Points of Contact

Caitlin Savina Contract SpecialistPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Sep 4, 2019
Version 1
Combined Synopsis/Solicitation
Posted: Sep 3, 2019
View
C--AITC Electrical Engineering Study - Grounding Study and Design (VA-19-00069954) | GovScope