C-- Construction - Sacramento VAMC - Correct Campus Water System

SOL #: 36E77619R0042Pre-Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
PCAC (36C776)
INDEPENDENCE, OH, 44131, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Architect/Engineer Services (C)

Set Aside

No set aside specified

Timeline

1
Posted
May 1, 2019

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Page 1 of 1

INTRODUCTION:

The Department of Veterans Affairs (VA), Program Contracting Activity Central (PCAC) anticipates soliciting proposals and subsequently awarding a single, Firm-Fixed-Price contract using DESIGN-BUILD selection procedures for the Correction of the Campus Water System at the Sacramento VA Medical Center (VAMC).

PROJECT DESCRIPTION:

The purpose of this water tower and reservoir project is to provide a sufficient water supply for the current and future expansion at the Sacramento VAMC. The Sacramento VAMC is a 43 building campus covering approximately 617,659 square feet. The water pressure and emergency water storage supply are required to be upgraded. It has been determined that upsizing the existing 6 water loop to an 8 and implementing an elevated water tank will solve pressure issues and hold a 96 hour emergency water supply. The scope of this project covers the entire Sacramento VAMC campus that is currently being serviced by three 8 waterlines coming from the south part of the campus along Peter McCuen Blvd. These lines are reduced to 6 inches inside the campus and form a loop around the campus. Each of the buildings are connected to the main loop by smaller lines, ranging from ¾ to 6 . There is also a 40,000 gallon above ground emergency water storage tank that is not connected to the loop. Fire suppression, hydrants, domestic water, irrigation, ect., are also tied into the main loop.

The Design Build (DB) contractor shall furnish all design (AE) services, materials, supplies, equipment, investigations and project supervision, and construction period services associated with this contract. Design shall meet VA Design Guides and Design Criteria and VA Master Specifications at the technical information library TIL (www.cfm.va.gov/TIL). Design shall follow all current applicable codes, including International Building Codes (IBC), National Fire Protection Association (NFPA), Occupational Safety and Health Administration (OSHA), and VA Plumbing Design Manual and VHA Directive 1061 design standards for protection against Healthcare-Associated (HCA) Legionella Disease (LD). The DB contractor shall also furnish all labor, materials, supervision, and administration for the construction phase of this contract.

ADMINISTRATIVE:

The solicitation will be issued as a Request For Proposal (RFP) conducted in accordance with FAR Parts 15, 19, and 36 and will be evaluated in accordance with the procedures listed in the solicitation. The solicitation will be advertised as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Proposals received from other than SDVOSB concerns will not be considered. The applicable NAICS code is 237110 with a size standard of $36.5 Million. The solicitation will be issued on or about June 4th, 2019. The period of performance is approximately 575 calendar days from the issuance of the Notice to Proceed. The Magnitude of Construction is expected to be greater than $10,000,000. This notice is not a request for competitive offers. All questions must be submitted in writing to the issuing office via email to kaylan.grove@va.gov and andrea.fink@va.gov. Telephone calls will not be accepted.

-END-

People

Points of Contact

Kaylan GrovePRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: May 1, 2019
C-- Construction - Sacramento VAMC - Correct Campus Water System | GovScope