C--D-B North Fume Replacement, Sacramento NWR

SOL #: 140FGA26R0001Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, GAOA
Falls Church, VA, 22041, United States

Place of Performance

Willows, CA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Other Architect And Engineering Services (C219)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 19, 2025
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Mar 20, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (USFWS), Department of the Interior, is soliciting proposals for Design-Build (D-B) Services for the North Flume Replacement at the Sacramento National Wildlife Refuge (NWR) in Willows, California. This Total Small Business Set-Aside opportunity is estimated between $500,000 and $1,000,000. Phase 1 proposals are due March 20, 2026, by 10:00 AM PT.

Scope of Work

This project requires comprehensive design-build services for the replacement of the North Flume. Key deliverables include:

  • Preparation of construction documents (35%, 65%, and 100% design development).
  • Environmental permitting assistance and acquisition of all necessary permits (e.g., USACE Section 404, RWQCB Section 401, CDFW Streambed Alteration Agreement).
  • Construction of a new fire-resistant and corrosion-resistant flume with adequate conveyance capacity (minimum 30 cfs) and a minimum 50-year service life.
  • Design and installation of two OSHA compliant, slip-resistant walkways with removable handrails and new stoplog slots with replacement wood stoplogs.
  • Demolition, removal, recycling, and disposal of the existing flume infrastructure.
  • Installation of erosion and sediment control measures, vegetation, and stabilization of disturbed areas.

Contract Details

  • Type: Firm Fixed-Price, Two-Phase Design-Build Selection Procedures (FAR 36.3).
  • Magnitude: Estimated between $500,000 and $1,000,000 for the entire design-build project.
  • Period of Performance: Overall 24 months, with 12 months allocated for design and permitting (Tasks 1-3) and 12 months for construction/build (Task 6). Item 00010 (Site Investigation, A-E Scoping, Design Development, Environmental Permitting Assistance) has a specific period of 04/20/2026 to 04/30/2027.
  • Special Requirements: All excavation activities must occur between May 1 and October 31. Strict measures for Giant Garter Snake (GGS) avoidance are required, including preconstruction surveys by USFWS. The contractor's Architect-Engineer (A-E) must be a licensed Professional Engineer in California. Contractor is responsible for obtaining all necessary permits. No geotechnical or as-built data is provided; bidders must field verify existing conditions. Compliance with federal, state, and local codes (e.g., IBC, NEC, NFPA 101, ADA/ABA) is mandatory. DOI clause 1428.301 requires liability insurance with minimum $500,000 coverage per person, per occurrence, and for property damage.

Submission & Evaluation

This is a two-phase procurement.

  • Phase 1: Non-cost proposals will be evaluated based on Recent Relevant Experience and Technical Approach. Offerors must submit CPARS evaluations or a Past Performance Questionnaire (PPQ) completed by a client. Only Phase 1 information should be submitted initially.
  • Phase 2: A maximum of three offerors selected from Phase 1 will be invited to submit proposals including Key Personnel, Price, Representations, Certifications, and a Bid Guarantee.
  • Award will be made on a best-value, tradeoff basis, considering cost/price and non-cost factors.

Key Dates & Contact

  • Phase 1 Proposal Due: March 20, 2026, by 10:00 AM PT.
  • Published Date: March 12, 2026.
  • Contact: Shanen Fox (shanen_fox@fws.gov).

People

Points of Contact

Fox, ShanenPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Solicitation
Posted: Mar 12, 2026
Version 4
Solicitation
Posted: Feb 12, 2026
View
Version 3
Solicitation
Posted: Feb 3, 2026
View
Version 2
Sources Sought
Posted: Jan 9, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 19, 2025
View
C--D-B North Fume Replacement, Sacramento NWR | GovScope