C--D-B North Fume Replacement, Sacramento National Wildlife Refuge

SOL #: 140FGA26R0001Award Notice

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, GAOA
Falls Church, VA, 22041, United States

Place of Performance

Willows, California

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Other Architect And Engineering Services (C219)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 19, 2025
2
Last Updated
Jun 9, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (USFWS), under the Department of the Interior, is soliciting proposals for Design-Build Services for the North Flume Replacement at the Sacramento National Wildlife Refuge in Willows, California. This is a Total Small Business Set-Aside with an estimated project magnitude between $500,000 and $1,000,000. Proposals are due by March 20, 2026, at 10:00 AM PT.

Scope of Work

The project requires comprehensive design-build services to replace the existing North Flume. Key deliverables include:

  • Design and Engineering: Site investigation, A-E scoping, data collection, field reports, technical memoranda, and development of 35%, 65%, and 100% construction documents. The contractor's A-E must be a California-licensed Professional Engineer.
  • Permitting: Contractor is responsible for determining and obtaining all necessary environmental and construction permits.
  • Construction: Demolition and removal of existing infrastructure, and installation of a new fire-resistant, corrugated metal pipe (CMP) flume designed for a minimum 50-year service life and capable of conveying at least 30 cfs. This includes two OSHA-compliant walkway surfaces with removable handrails, and stoplog slots with replacement wood stoplogs.
  • Environmental Compliance: Strict measures for Giant Garter Snakes (GGS) are required, including preconstruction surveys and specific protocols for encounters. All excavation activities are restricted to May 1 through October 31.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP) Design-Build Construction.
  • Estimated Magnitude: $500,000 - $1,000,000 (for the entire design-build project).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a $45.0M size standard.
  • Period of Performance: An overall period of 24 months, with 12 months allocated for design and permitting, and 12 months for construction/build.

Submission & Evaluation

This procurement follows FAR 36.3 Two-Phase Design-Build Selection Procedures.

  • Phase 1 Evaluation: Non-cost proposals will be evaluated based on Recent Relevant Experience and Technical Approach. A maximum of three offerors will be selected to proceed to Phase 2.
  • Phase 2 Submission: Selected offerors will submit proposals including Key Personnel, Price, representations, certifications, and a bid guarantee.
  • Award Basis: Best-value, tradeoff basis, allowing tradeoffs among cost/price and non-cost factors.
  • Proposal Due Date: March 20, 2026, by 10:00 AM PT. Proposals must be submitted electronically via email.

Key Clarifications & Notes

  • Insurance: DOI clause 1428.301 requires liability insurance with minimum coverage of $500,000 per person, $500,000 per occurrence, and $500,000 for property damage.
  • Past Performance: Offerors must submit CPARS or a Past Performance Questionnaire (PPQ) completed by a client. No standard PPQ form is provided.
  • Site Data: No geotechnical or subsurface investigation data is available. As-built dimensions or additional drawings for the existing flume are not available beyond what was attached to the solicitation. Exhibit 2 drawing is for reference only; contractors must field verify existing conditions.
  • Wage Rates: Bidders must use prevailing wage rates provided in Attachment 4 for labor cost estimation.
  • Registration: Contractors must be registered in the System for Award Management (SAM) to participate.
  • Contact: Inquiries must be submitted in writing to Shanen Fox at shanen_fox@fws.gov.

People

Points of Contact

Fox, ShanenPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Award Notice
Posted: Jun 9, 2026
Version 5
Solicitation
Posted: Mar 12, 2026
View
Version 4
Solicitation
Posted: Feb 12, 2026
View
Version 3
Solicitation
Posted: Feb 3, 2026
View
Version 2
Sources Sought
Posted: Jan 9, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 19, 2025
View
C--D-B North Fume Replacement, Sacramento National Wildlife Refuge | GovScope