C--Manchester Pier Shimming Project

SOL #: 1305M326Q0067Sources Sought

Overview

Buyer

Commerce
National Oceanic And Atmospheric Administration
DEPT OF COMMERCE NOAA
SEATTLE, WA, 98115, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Other Architect And Engineering Services (C219)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 11, 2026
2
Response Deadline
Feb 26, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Oceanic and Atmospheric Administration (NOAA), Western Acquisition Division (WAD), is conducting market research through a Sources Sought Notice (SSN) for a Design-Build Contractor to perform the Manchester Pier Shimming Project in Port Orchard, WA. This project aims to restore the vertical load path of the pier by shimming over sixty non-bearing timber piles. Responses are due by February 26, 2026, at 2:00 p.m. Pacific Time.

Scope of Work

The requirement is for a Design-Build Contractor to restore the vertical load path of the Manchester Pier, a timber pile structure, by shimming all piles currently not in contact with the substructure. This will re-establish positive bearing connections to support an "Owner-Specified Vehicle" (OSV) load of 12,000 pounds. Key tasks include:

  • Providing all labor, materials, equipment, engineering, and supervision for design and execution.
  • Field verifying gap dimensions and producing "Issued for Construction" drawings.
  • Designing a positive, mechanical connection using high-density plastic shims (e.g., UHMW polyethylene) resistant to wave action and structural vibration.
  • Installing designed plastic shimming at over 60 non-bearing pile-to-cap locations.
  • Preparing surfaces by cleaning marine growth, rot, and debris.
  • Securing shims mechanically and piles to the cap to resist lateral movement.

Contract & Timeline

  • Opportunity Type: Sources Sought Notice (SSN) for market research.
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction).
  • Set-Aside: None specified.
  • Period of Performance: Anticipated 180 days (6 months) after contract award.
  • Response Due: February 26, 2026, 2:00 p.m. Pacific Time.
  • Published: February 11, 2026.

Information Requested

NOAA requests the following information from interested firms:

  • Name and address of firm.
  • Point of contact (address and phone number).
  • Size of business and any SBA small business certifications (e.g., small, 8(a), woman-owned).
  • Applicable experience related to the scope of the draft SOW.
  • Indication of whether the company is likely to provide a quote if a solicitation arises.

Additional Notes

This is not a solicitation, and no proposals, quotes, or bids will be accepted. No reimbursement will be made for costs associated with responding. Responses are limited to eight (8) PDF pages (excluding cover page). Submissions should be sent to Contract Specialist Anna Ma (anna.ma@noaa.gov) and Contracting Officer Kayla Johnson (kayla.johnson@noaa.gov).

People

Points of Contact

MA, ANNAPRIMARY

Files

Files

Download
Download

Versions

Version 1Viewing
Sources Sought
Posted: Feb 11, 2026
C--Manchester Pier Shimming Project | GovScope