P--CABLE RACEWAY REMOVAL

SOL #: 140G0126Q0068Solicitation

Overview

Buyer

Interior
Us Geological Survey
OFC OF ACQUSITION GRANTS-NATIONAL
RESTON, VA, 20192, United States

Place of Performance

Place of performance not available

NAICS

Site Preparation Contractors (238910)

PSC

Demolition Of Structures Or Facilities (Other Than Buildings) (P500)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 18, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 15, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Geological Survey (USGS), under the Department of the Interior, is soliciting quotations for Cable Raceway Removal (P--CABLE RACEWAY REMOVAL) for the Allisonia Cableway Demolition-Calloway project. This is a Solicitation for firm-fixed-priced services to dismantle and remove a discontinued cableway structure. Quotations are due by May 15, 2026, at 1:00 PM EST.

Scope of Work

The primary objective is the demolition and removal of a discontinued cableway structure at an active gaging station. Key tasks include:

  • Dismantling the cableway structure.
  • Removing a 1" structural strand, an 850 ft 1/4” cable for aircraft warning markers, and 5/8" backstay cables at each tower.
  • Extracting and disposing of a submerged concrete anchor block (3.5 ft x 3.5ft x 6ft) from the New River.
  • Removing a 30 ft steel tower on the right bank attached to 4 concrete piers.
  • Removing remnants of the left bank tower and concrete footers on the stream bank.
  • Filling voids resulting from structure removal with appropriate material.
  • Restoring any disturbed portion of the New River Trail to State Park requirements.
  • Hauling away all debris, including cable, towers, cable connections, concrete anchors, and concrete piers.
  • Erecting temporary barricades during demolition and removal.

Contract & Timeline

  • Contract Type: Firm-fixed-priced.
  • Period of Performance: 90 days from the date of award.
  • Award Basis: Lowest Price Technically Acceptable (LPTA).
  • Set-Aside: Not specified in metadata; conflicting information exists in documents (main solicitation indicates "IS NOT A SMALL BUSINESS SET-ASIDE", while Attachment A states it is a "Small Business Set-Aside opportunity").
  • Quotations Due: May 15, 2026, at 1:00 PM EST.
  • Site Visit: A site visit was scheduled for Tuesday, March 31, 2026, at 10:00 AM EST, located at 36°56'15"N, -80°44'45"W, 4380 State Rte 653, Draper, VA 24324 (Pulaski County).

Submission & Evaluation

  • Submission Method: Quotations must be submitted via email to bfbaker@usgs.gov. Faxed or mailed quotations will not be accepted.
  • Quotation Package: Must be in PDF format and include all quotation documents, SAM UEI, and the cover page of the solicitation and all amendments.
  • Questions: All questions regarding the RFQ were to be sent via email to the Contract Specialist by 1:00 PM EST, Tuesday, April 7, 2026. A future amendment is anticipated to provide answers to vendor questions.
  • Evaluation: Award will be based on the Lowest Price Technically Acceptable (LPTA) criteria.

Additional Notes

  • Wage Determination: Attachment B details prevailing wage rates for heavy dredging construction projects statewide in Virginia (General Decision Number: VA20260001, Publication Date: 01/30/2026). Bidders must account for these rates in their proposals.
  • Contact: Brian Baker (bfbaker@usgs.gov).
  • Place of Performance: FOB Destination to the USGS Virginia Water Science Center in Richmond, VA. The site visit location is in Draper, VA.

People

Points of Contact

Baker, BrianPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Apr 29, 2026
Version 3
Solicitation
Posted: Apr 15, 2026
View
Version 2
Solicitation
Posted: Mar 18, 2026
View
Version 1
Special Notice
Posted: Mar 18, 2026
View