Call for Solution - Integrated Command and Control Infantry Squad Vehicles

SOL #: CFS-25-ICCISV-01Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-APG
ABERDEEN PROVING GROU, MD, 21005-1846, United States

Place of Performance

Aberdeen Proving Ground, MD

NAICS

Engineering Services (541330)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Vehicular Equipment Components (J025)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 26, 2026
2
Last Updated
Apr 28, 2026
3
Response Deadline
Apr 8, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This Call for Solutions (CFS) for Integrated Command and Control (C2) Infantry Squad Vehicles (ISVs), issued by the Army Contracting Command – Aberdeen Proving Ground (ACC-APG) on behalf of Product Manager Command Post Modernization (PdM CPMod), has been officially cancelled. The Government appreciates all interest shown in this initiative.

Original Purpose

The CFS originally sought innovative solutions for integrating C2 systems onto Infantry Squad Vehicles to support unit exercises and drive demand, building on needs identified during Command and Control on the Move (C2 OTM) fielding.

Key Details (Prior to Cancellation)

  • Original Submission Deadline: Solution Briefs were due April 08, 2026.
  • Original Questions Due: March 30, 2026.
  • Contract Type: Intended to be an Other Transaction(s) (OT) for Prototype Project(s) or potentially a FAR Part 12, Firm-Fixed-Price (FFP) contract, based on solution maturity.
  • Key Requirements: Deliver three integrated prototypes within four months, integrate specified "B-kit" equipment, ensure "On the Move" and "At the Quick Halt" functionality, and provide a Level 2 technical data package.
  • Evaluation Phases: Phase 1 (Solution Brief), Phase 2 (Pitch), Phase 3 (Solution Proposal).
  • Eligibility: Companies required a Unique Entity ID (UEI), SAM.gov registration, and to accurately represent business status.

Cancellation Notice

This action is officially cancelled. The Government looks forward to future collaborative opportunities. No further submissions or actions are required for this specific notice.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 4Viewing
Sources Sought
Posted: Apr 28, 2026
Version 3
Sources Sought
Posted: Apr 28, 2026
View
Version 2
Sources Sought
Posted: Apr 1, 2026
View
Version 1
Sources Sought
Posted: Mar 26, 2026
View
Call for Solution - Integrated Command and Control Infantry Squad Vehicles | GovScope