Call for Solution - Integrated Command and Control Infantry Squad Vehicles
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This Call for Solutions (CFS) for Integrated Command and Control (C2) Infantry Squad Vehicles (ISVs), issued by the Army Contracting Command – Aberdeen Proving Ground (ACC-APG) on behalf of Product Manager Command Post Modernization (PdM CPMod), has been officially cancelled. The Government appreciates all interest shown in this initiative.
Original Purpose
The CFS originally sought innovative solutions for integrating C2 systems onto Infantry Squad Vehicles to support unit exercises and drive demand, building on needs identified during Command and Control on the Move (C2 OTM) fielding.
Key Details (Prior to Cancellation)
- Original Submission Deadline: Solution Briefs were due April 08, 2026.
- Original Questions Due: March 30, 2026.
- Contract Type: Intended to be an Other Transaction(s) (OT) for Prototype Project(s) or potentially a FAR Part 12, Firm-Fixed-Price (FFP) contract, based on solution maturity.
- Key Requirements: Deliver three integrated prototypes within four months, integrate specified "B-kit" equipment, ensure "On the Move" and "At the Quick Halt" functionality, and provide a Level 2 technical data package.
- Evaluation Phases: Phase 1 (Solution Brief), Phase 2 (Pitch), Phase 3 (Solution Proposal).
- Eligibility: Companies required a Unique Entity ID (UEI), SAM.gov registration, and to accurately represent business status.
Cancellation Notice
This action is officially cancelled. The Government looks forward to future collaborative opportunities. No further submissions or actions are required for this specific notice.