Campground Water and Electrical Utility Lines Install

SOL #: PANNWD26P0000030973Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W071 ENDIST KANSAS CITY
KANSAS CITY, MO, 64106-2896, United States

Place of Performance

Sylvan Grove, KS

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

No set aside specified

Timeline

1
Posted
May 21, 2026
2
Response Deadline
Jun 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers, Kansas City District, is conducting a Sources Sought to identify qualified contractors for Campground Water and Electrical Utility Lines Installation at Minooka Park C Loop Campground, Wilson Lake, Kansas. This market research aims to inform a potential future acquisition for construction services. Responses are due June 5, 2026.

Scope of Work

The project involves providing all plant, labor, equipment, and materials (excluding Government-Furnished Materials) to install water and electrical utility lines. This will establish individual campsite power and water connections along C-Loop in the Minooka Park Campground. Government-furnished materials include 31 4ft Freezeless Yard Hydrants and 31 RV Post Electric Pedestals. The estimated magnitude of this construction project is between $500,000 and $1,000,000.

Contract & Timeline

  • Type: Sources Sought / Market Research
  • Estimated Magnitude: $500,000 - $1,000,000
  • Period of Performance: 180 days after notice to proceed
  • NAICS: 237990 – Other Heavy and Civil Engineering Construction (Size Standard: $45M)
  • PSC: Y1NZ - Construction of Other Utilities
  • Set-Aside: None specified (market research stage); potential for small business set-asides (8(a), HUBZone, SDVOSB, WOSB) will be determined by responses.
  • Response Due: June 5, 2026, 12 PM CDT
  • Published: May 21, 2026

Response Requirements

Interested parties must submit a capabilities statement (max 10 pages, Times New Roman, 10 pitch) addressing:

  • Business name, address, POC, phone, email.
  • UEI and CAGE Code.
  • Stated interest in bidding if a solicitation is issued.
  • Capability to perform a contract of this magnitude and complexity.
  • Business type and size.
  • Joint Venture information (if applicable).
  • Bonding capability.
  • Examples of work done by subcontractors (if applicable, with letter of commitment).
  • Details of a relevant project completed within the last 5 years (project name, date, description of self-performed work, customer). The proposed contract action is anticipated to include tasking subject to the Davis Bacon Act.

Submission Details

Responses must be submitted electronically in Microsoft Word or PDF format to Contract Specialist Nathaniel Leyba (Nathaniel.J.Leyba@usace.army.mil) and Contracting Officer Laura Hedrick (Laura.L.Hedrick@usace.army.mil). No phone calls will be accepted; all questions must be submitted to the contract specialist. This is for informational purposes only and does not constitute a solicitation or commitment to award a contract.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Sources Sought
Posted: May 21, 2026
Campground Water and Electrical Utility Lines Install | GovScope