- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service, Northeast Region (Department of the Interior) is soliciting proposals for the turnkey construction and installation of a double vault toilet at the Marconi Site, Cape Cod National Seashore, Wellfleet, MA. This opportunity is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside with an estimated magnitude between $100,000 and $250,000. Proposals are due by April 21, 2026, at 12:00 PM ET.
Scope of Work
This project involves the comprehensive, turnkey installation of a marine-grade modular double vault toilet with a utility room. The scope includes:
- Demolition and removal of existing structures, trees, and vegetation within the work limits.
- Site preparation, excavation, and sub-grade preparation.
- Installation of a new concrete slab on grade and approximately 30 linear feet of accessible concrete walkway connecting to existing paths.
- Provision of all labor, materials, tools, and supervision.
- Compliance with Massachusetts DEP requirements for sealed tanks, ADA accessibility (ABAAS), and building codes (2024 IBC, IECC).
- Contractor responsibility for obtaining all federal, state, and local permits, including MassDEP approvals, inspections, and associated fees.
- Development and implementation of a Stormwater Pollution Prevention Plan (SWPPP).
Contract Details
- Contract Type: Firm Fixed Price
- NAICS Code: 237110 (Water & Sewer Line Related Structures Construction)
- Small Business Size Standard: $45M
- Period of Performance: May 1, 2026, to August 27, 2026. Work must commence within 10 calendar days of notice to proceed and be completed within 120 calendar days.
- Work Restrictions: Tree removal (greater than or equal to 3 inches DBH) is restricted to between December 1 and March 15 to avoid impacts to federally listed bat species and migratory birds. Contractors must plan and sequence work accordingly. Onsite work is prohibited during specified seasonal restriction periods.
Submission & Evaluation
- Proposals Due: April 21, 2026, at 12:00 PM ET.
- Submission Method: Via email to Samuel McKenzie (Samuel_McKenzie@nps.gov).
- Evaluation: Best Value Continuum Tradeoff Process, where technical factors, past performance, and price will be considered equally important.
- Eligibility: Offerors must be registered in SAM.gov and adhere to Davis Bacon Wage Rates and Limitation on Subcontracting requirements.
Clarifications & Notes
Responses to RFIs (1-30) clarify that any modular double vault toilet system meeting MassDEP, ABAAS, and NPS requirements may be proposed, with a minimum vault capacity of 2,000 gallons. The utility room is for passive storage, with no electrical or active utilities required. Site plans are for general coordination, and field verification of existing conditions is required.