J--CAPE COD NS - BALANCE THREE PHASE POWER AT BIO LAB

SOL #: 140P4326R0016Award Notice

Overview

Buyer

Interior
National Park Service
NER SERVICES MABO (43000)
BOSTON, MA, 02108, United States

Place of Performance

Truro

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electric Wire, And Power And Distribution Equipment (J061)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 15, 2026
2
Last Updated
May 30, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service, under the Department of the Interior, is soliciting proposals for balancing the three-phase power at the Bio Lab located at Cape Cod National Seashore in Truro, Massachusetts. This is a Total Small Business Set-Aside opportunity. The project involves comprehensive electrical system modifications and upgrades. Proposals are due by May 1, 2026, at 10:00 am local time.

Scope of Work

This project requires the contractor to balance the three-phase power in Building 45 (NAC/Bio-Lab) by replacing the existing 120/208V, 2-pole, 3-wire "Existing Panel Main 2" with a new three-phase, 4-wire, 225-amp panelboard designated as "New Panel Main-2." Key tasks include:

  • Providing all necessary labor, qualified supervision, materials, tools, equipment, supplies, and incidentals.
  • Removing existing service conductors and installing new ones from a splice point to the main distribution panel.
  • Converting the existing panel enclosure to a splice cabinet.
  • Providing a new three-phase, four-wire, 150-amp feeder to the new panel and extending branch circuits.
  • Performing all system calculations, including arc flash and fault current analysis, in compliance with NEC 2023 and the Massachusetts State Electrical Code.
  • Providing new arc flash and panelboard labels.
  • Ensuring a turnkey installation, including engineering, procurement, construction, testing, and commissioning.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Period of Performance: June 1, 2026, to February 19, 2027. The contractor must begin performance within 14 calendar days and complete work within 140 calendar days after receiving notice to proceed.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 238210 – Electrical Contractors and Other Wiring Installation Contractors (Small Business Size Standard: $19.0 Million).
  • Place of Performance: 32 Old Dewline Road, Truro, MA 02666, United States.
  • Wage Determinations: Bidders must adhere to the prevailing wage rates and fringe benefits specified in General Decision Number MA20260001, published 01/02/2026, for building construction projects in Barnstable and other Massachusetts counties.

Submission & Evaluation

  • Proposal Submission Deadline: May 1, 2026, by 10:00 am local time.
  • Submission Method: Proposals must be submitted via email.
  • Evaluation: Best Value Continuum Tradeoff Source Selection Process, considering technical capability, management approach, past performance, and price.
  • Site Visit: A pre-proposal site visit was conducted on April 29, 2026.

Key Documents / Notes

  • Solicitation: 140P4326R0016, amended by Amendment 0001 (dated May 1, 2026), which extended the offer receipt date.
  • Attachments: Include Construction Specifications, Construction Drawings (detailing existing and new electrical equipment, single-line diagrams, and site plans), Construction Wage Decision (Davis-Bacon Wage Rates), and Construction Contract Administration provision (referencing FAR 36.211(b)).
  • Contact: Jason Albright, Jason_Albright@ios.doi.gov, 617-519-6145.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Award Notice
Posted: May 30, 2026
Version 2
Solicitation
Posted: May 1, 2026
View
Version 1
Solicitation
Posted: Apr 15, 2026
View
J--CAPE COD NS - BALANCE THREE PHASE POWER AT BIO LAB | GovScope