Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, Rock Island District, is soliciting bids for the Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station in Cedar Rapids, IA. This Unrestricted Invitation for Bid is for a construction contract estimated between $25,000,000 and $100,000,000. Amendment 0002 has indefinitely suspended the bid submission due date and bid opening. A new amendment will be issued to re-establish these dates.
Scope of Work
The project involves comprehensive heavy and civil engineering construction, including site demolition, temporary traffic controls, clearing, grubbing, stripping, and removal of pavements, levees, and utilities. New construction encompasses rigid and flexible pavements, storm sewers, manholes, catch basins, a cast-in-place concrete floodwall, storm sewer outlets, gate wells, geotechnical instrumentation, relief wells, trench and toe drains, and a pump station.
Contract & Timeline
- Contract Type: Firm Fixed Price, Invitation for Bid
- Estimated Value: $25,000,000 - $100,000,000
- NAICS Code: 237990 (Size Standard: $45,000,000)
- Set-Aside: Unrestricted
- Period of Performance: 970 consecutive calendar days (updated by Amendment 0001).
- Bid Submission: Indefinitely suspended per Amendment 0002. The 08 April 2026 date is a placeholder.
- Site Visit: December 02, 2025, at 9:00 AM CST. RSVP to Matthew Hosford by November 28, 2025, 10:00 AM CST.
- Questions Due: December 18, 2025, 2:00 PM CST via ProjNet.
- Bonds: Bid Guarantee, Performance, and Payment Bonds are required. A Project Labor Agreement (PLA) will also be required.
Key Amendments & Instructions
Amendment 0002 (posted 2025-12-22) indefinitely suspended the bid due date and opening. It also updated Plans and Specifications, added FAR Clause 52.219-4 (Notice of Price Evaluation Preference for HUBZone Small Business Concerns), and revised Instructions to Bidders for electronic submission. Amendment 0001 (posted 2025-11-24) extended the contract completion days to 970 and previously extended the bid due date to January 08, 2026, which is now superseded.
Additional Information
Due to file size limitations, not all required files (Solicitation with Specifications, Attachment J-2 Plan Set - VOL 401 Floodwall) are posted on SAM.gov. Interested parties must email Samantha Johanson (samantha.k.johanson@usace.army.mil) or Brunson Grothus (brunson.e.grothus@usace.army.mil) to receive a link to these files via DoD SAFE.