Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

SOL #: W912EK26CA016Award Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W07V ENDIST ROCK ISLAND
ROCK ISLAND, IL, 61299-5001, United States

Place of Performance

Cedar Rapids, IA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

No set aside specified

Timeline

1
Posted
May 4, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, specifically W07V ENDIST ROCK ISLAND, has issued an Award Notice for the Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station in Cedar Rapids, IA. This award was made following solicitation W912EK26BA001.

Scope of Work

This project involves the construction and restoration of real property, specifically focusing on flood risk management infrastructure. The scope includes the development of a downstream river floodwall and a pump station as part of the Cedar Rapids Flood Risk Management Project.

Contract & Timeline

  • Type: Award Notice
  • Solicitation ID: W912EK26BA001
  • Award Date: May 4, 2026
  • Set-Aside: None specified

Evaluation

The award was made to the low bidder as per the terms of solicitation W912EK26BA001.

People

Points of Contact

Samantha JohansonPRIMARY
Brunson GrothusSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Award Notice
Posted: May 4, 2026
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station | GovScope