Celeroton Products

SOL #: PR443038Combined Synopsis/Solicitation

Overview

Buyer

Energy
Energy, Department Of
ORNL UT-BATTELLE LLC-DOE CONTRACTOR
Oak Ridge, TN, 37831, United States

Place of Performance

Oak Ridge, TN

NAICS

Air and Gas Compressor Manufacturing (333912)

PSC

Gas Turbines And Jet Engines, Aircraft, Prime Moving; And Components (2840)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 9, 2026
2
Submission Deadline
Feb 17, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Oak Ridge National Laboratory (ORNL) is requesting Firm Fixed Price proposals for specific Celeroton Products, including a Motor, Converter, Connector set, and Supply cable, or their domestic equivalents. The award will be made to the lowest priced, technically acceptable proposal. Proposals are due February 17, 2026, at 4:00 PM EST.

Scope of Work

This opportunity requires the procurement of the following specific Celeroton components:

  • Motor CM-25-280.RM03.B01.F00.C00.W01 (7 units)
  • Converter CC-230-3500 (3 units)
  • Connector set CC-230-3500 (3 units)
  • Supply cable CC-230-3500 US 2m (3 units)

Bidders must provide pricing for these items or their domestic equivalents, adhering to FAR 52.211-6 Brand Name or Equal. Required submissions include a firm fixed price quote, a proposed delivery schedule, and a completed and signed copy of the Abbreviated Representations and Certifications (Attachment D).

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: None (No Small Business Set-Aside)
  • NAICS Code: 333912 - Air and Gas Compressor Manufacturing
  • Place of Performance: Oak Ridge, TN
  • Offer Validity: 120 days
  • Questions Due: February 15, 2026, 4:00 PM EST
  • Proposal Due: February 17, 2026, 4:00 PM EST
  • Published: February 9, 2026

Evaluation

Award will be based on the lowest priced, technically acceptable proposal. Technical acceptability will be determined by adherence to the specifications for the Celeroton products or approved domestic equivalents.

Key Documents & Requirements

  • Attachment A (Terms & Conditions): Outlines general terms and conditions for commercial items under simplified acquisition, covering disputes, warranties, shipping, payment, compliance, and PII protection.
  • Attachment B (Prime Flowdown Clauses): Details mandatory FAR, DEAR, and DOE clauses incorporated by reference, covering ethics, telecommunications restrictions, Buy American Act, IT security, and more.
  • Attachment C (Bill of Materials): Lists the required items, quantities, and provides placeholders for bidder pricing, lead time, and country of origin.
  • Attachment D (Reps & Certs): A mandatory form for offerors to complete regarding business status, export control, Buy American Act, child labor, telecommunications services, and conflicts of interest.
  • Submission: All proposals and questions must be submitted via email to the Procurement Officer, Brittanie Mack-Brewster (mackbrewstbc@ornl.gov).

People

Points of Contact

Brittanie Mack-BrewsterPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
Celeroton Products | GovScope