Centralized Waste Processing System

SOL #: 040ADV-25-R-0028Combined Synopsis/Solicitation

Overview

Buyer

Government Publishing Office
United States Government Publishing Office
Acquisition Services
Washington, DC, 20401, United States

Place of Performance

Stennis Space Center, MS

NAICS

Waste Treatment and Disposal (56221)

PSC

Architect And Engineering Construction: Sewage And Waste Facilities (C1ND)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 4, 2025
2
Last Updated
Jan 22, 2026
3
Submission Deadline
Jan 26, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Government Publishing Office (GPO) is soliciting proposals for the design, delivery, and installation of a Centralized Waste Processing System at its Secure Production Facility (SPF) within NASA's Stennis Space Center, MS. This system will replace four existing independent waste management systems, automating the secure processing of both secure and non-secure waste using disintegrating and briquetting technologies, thereby eliminating the need for incineration.

Scope of Work

The contractor will design, deliver, and install a fully automated system that integrates seamlessly with existing production equipment. Key requirements include:

  • Minimizing GPO personnel intervention.
  • Preventing inadvertent processing of finished goods.
  • Utilizing advanced disintegrating and briquetting technologies.
  • Handling both secure and non-secure waste, with pulp stored for offsite removal.
  • Fitting within a 37x46 ft area (potential expansion to 39x48 ft if requested).
  • Including disintegrators, briquetting machines, dust/material conveyance fans, cyclone separators, airlocks, waste containers, and diverter valves.
  • Scalability to process up to 450 pounds of waste per hour.
  • Compliance with NASA security protocols and building codes.
  • Adherence to strict security protocols for Stennis Space Center, including badging and vehicle entry, with potential delays for non-US citizens.

Contract Details & Timeline

  • Contract Type: Firm-Fixed-Price (FFP) under the Materials Management Acquisition Regulation (MMAR).
  • Period of Performance: Five years, with option CLINs for rehabilitation.
  • Set-Aside: None.
  • Proposal Due: February 2, 2026, 05:00 PM CST.
  • Questions Due: December 9, 2025, 10:00 AM CST.
  • Mandatory Site Visit: Attendance at either the November 19, 2025, or December 2, 2025 site visit was mandatory for proposal submission. Personnel must be U.S. Citizens.
  • Estimated Award: Winter 2026.
  • Final Design Due: March 31, 2026.
  • Installation by: June 30, 2026.

Evaluation Factors

Award will be made using a Best Value Tradeoff process. Evaluation factors include:

  • Technical Approach & Design (most important)
  • Corporate Capability and Experience
  • Past Performance (assessed via Attachment J.4 questionnaire)

Submission Requirements

Offerors must be registered in the System for Award Management (SAM) at www.sam.gov at the time of proposal submission. Proposals must remain valid for 120 days. Bidders must use the provided pricing template (Attachment J.1) for cost breakdown.

People

Points of Contact

Rebecca NicholsPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Jan 22, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Jan 20, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Jan 12, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Nov 21, 2025
View
Version 2
Combined Synopsis/Solicitation
Posted: Nov 18, 2025
View
Version 1
Combined Synopsis/Solicitation
Posted: Nov 4, 2025
View