CGC KIMBALL BILGE CLEANING

SOL #: 11707PR260000411Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 2(00085)
ALAMEDA, CA, 94501, United States

Place of Performance

HI

NAICS

All Other Miscellaneous Waste Management Services (562998)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Ship And Marine Equipment (J020)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 15, 2026
2
Submission Deadline
Jul 1, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The US Coast Guard is seeking proposals for bilge cleaning services for the CGC KIMBALL (WMSL 756) at Coast Guard Base Honolulu, Hawaii. This opportunity, a Combined Synopsis/Solicitation, requires contractors to furnish all labor, equipment, materials, and supervision to safely clean, remove, and dispose of contaminants from designated bilge spaces. The service supports cutter maintenance, environmental compliance, and operational readiness. Proposals are due July 1, 2026.

Scope of Work

The contractor will perform comprehensive bilge cleaning and inspection services. Key tasks include:

  • Cleaning: Thoroughly clean all bilge surfaces in the AFT MAIN MACHINERY ROOM, FORWARD MACHINERY ROOM, and AUXILIARY MACHINERY ROOM. This involves removing dirt, oil, sediment, sludge, and other foreign materials without damaging coatings or contaminating machinery. All fluids, cleaning media, and residues must be continuously removed and disposed of according to regulations. Surfaces are to be wiped dry with lint-free cloths.
  • Inspection: Conduct a visual inspection of bilge surfaces to identify and note any corrosion or damage, including to the paint system.
  • Protective Measures: Install and remove protective coverings to shield non-affected vessel components, equipment, and spaces near the work area. Ensure the area is returned to its original condition upon completion.

Performance Standards

  • Operational Tests: Witness an initial operational test of bilge sensor(s)/alarm(s) before work begins. Perform a thorough test demonstrating satisfactory operation after work completion, in the presence of a Coast Guard Inspector. A Contractor Furnished Report (CFR) must be submitted for both tests.
  • Visual Inspection: Document any observed corrosion or damage to bilge surfaces and paint systems.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation
  • Set-Aside: None specified
  • Response Due: July 1, 2026, by 6:00 PM Z
  • Published: June 15, 2026
  • Performance Period: August 17 through August 21, between 0800 and 1500 hours.
  • Place of Performance: CGC KIMBALL (WMSL 756), Coast Guard Base Honolulu, Hawaii.

Special Requirements

  • Personnel: All contractor and subcontractor personnel must be U.S. citizens and possess a valid RAPIDS ID or CAC card for base access. Non-U.S. citizens are not authorized.
  • Compliance: Adherence to all applicable Occupational Safety and Health Administration (OSHA) standards and Coast Guard safety policies is mandatory.
  • Environmental Protection: Strict compliance with Federal, state, and local regulations for the collection, containment, and disposal of all fluids, wash media, residues, and cleaning materials. This includes requirements outlined in SFLC Std Spec 0000 Appendix B for hazardous waste disposal and storm water management.
  • References: Work must comply with Coast Guard Drawing 418A-WMSL_593_1, SFLC Standard Specification 0000 (2018), and SSPC Surface Preparation Specification No. 11 (2012).

Contact Information

People

Points of Contact

Files

Files

Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jun 15, 2026
CGC KIMBALL BILGE CLEANING | GovScope