Cherokee National Forest Project TN ERFO FS CHRKE804 2020-2(4)

SOL #: 693C73-26-C-000012Award Notice

Overview

Buyer

Transportation
Federal Highway Administration
693C73 EASTERN FED LANDS DIVISION
Ashburn, VA, 20147, United States

Place of Performance

TN

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) (HZC)

Timeline

1
Posted
Jun 18, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration, under the Department of Transportation, has issued an Award Notice for the Cherokee National Forest Project TN ERFO FS CHRKE804 2020-2(4). This project, located in Tennessee, involves significant road repair work. The total awarded value across Schedule A and Schedule B, including material incentives, is $6,435,688.90. This opportunity was designated as a Historically Underutilized Business (HUBZone) Set-Aside.

Scope of Work

The project specifically entails the repair of storm and flood damage on Little Gassaway Road (FS 45) and Sina Branch Road (FS 67) within the Cherokee National Forest. The award covers work detailed under Schedule A (valued at $3,582,153.25 plus $54,223.65 in material incentives) and Schedule B (valued at $2,764,667.00 plus $34,645.00 in material incentives).

Contract & Timeline

  • Type: Award Notice (Construction of Highways, Roads, Streets, Bridges, And Railways)
  • Total Value: $6,435,688.90
  • Set-Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
  • Award Date: June 18, 2026
  • Notice Identifier: 29b2fa8b15b54b03a59c1b9a4ea098a2

Evaluation

This award followed a competitive bidding process, as evidenced by the release of a Bid Tabulation Report. This report detailed bids received from various contractors for different schedules and line items, including base schedules, options, and specific pay items. It also included engineer's estimates, providing insight into the government's cost expectations and the competitive landscape.

Additional Notes

The Bid Tabulation Report for Project No. TN ERFO FS CHRKE804 2020(4) is a crucial document for understanding the competitive pricing submitted by various contractors and benchmarking pricing strategies for similar future opportunities. For inquiries, contact Monique Lynch or C. Shawn Long at EFLHD.Contracts@dot.gov.

People

Points of Contact

Monique LynchPRIMARY
C. Shawn LongSECONDARY

Files

Files

Download

Versions

Version 1Viewing
Award Notice
Posted: Jun 18, 2026
Cherokee National Forest Project TN ERFO FS CHRKE804 2020-2(4) | GovScope