Chiller Replacement Roybal Campus
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Centers for Disease Control and Prevention (CDC) is soliciting proposals for a Total Small Business Set-Aside design-build contract for the Chiller Replacement Roybal Campus project in Atlanta, GA. This opportunity involves modernizing Building 10's central plant by replacing aging chilled-water equipment and upgrading infrastructure. The estimated construction magnitude is $15,000,000 to $25,000,000. Proposals are due June 17, 2026, at 10:00 a.m. local time.
Opportunity Details
- Agency: CDC Office of Acquisition Services, Health and Human Services
- Location: CDC Roybal Campus, Atlanta, GA (30329)
- Contract Type: Firm Fixed Price Design-Build Construction
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 238220 (Mechanical)
- Product Service Code: Z2AA (Repair Or Alteration Of Office Buildings)
- Estimated Value: $15,000,000 - $25,000,000
Scope of Work
This project requires complete design, engineering, management, supervision, labor, materials, equipment, testing, commissioning, training, and closeout services. Key tasks include:
- Replacing four existing 1,450-ton chillers with new 1,800-ton chillers.
- Replacing nine existing cooling tower cells with eight new ones, including structural modifications.
- Replacing primary chilled-water pumps, condenser-water pumps, and associated controls and piping.
- Performing medium-voltage and low-voltage electrical upgrades, Building Automation System (BAS)/controls integration, structural work, fire protection modifications, and ancillary systems work.
- Executing the project in phases, ensuring no more than two chillers are removed from service at any time to maintain campus operations.
Period of Performance
The period of performance is 462 calendar days after the Notice to Proceed.
Key Dates
- Questions Due: May 27, 2026, 12:00 p.m. local time
- Proposal Due: June 17, 2026, 10:00 a.m. local time
- Site Visit: May 19, 2026, 10:00 a.m. local time (already occurred)
Evaluation Criteria
Proposals will be evaluated using a tradeoff process where non-price factors are significantly more important than price. The non-price factors include:
- Past Performance
- Technical Approach
- Organization of Proposed Team and Team Members' Professional Qualifications
- Project Schedule
Special Requirements
- Performance Bonds are required.
- Non-Disclosure Agreements (NDAs) were required for site visit attendance and are necessary for access to certain project information.
- Site visit attendance was limited to U.S. citizens (maximum three per offeror).
- Bidders must comply with prevailing wage rates for Building Construction Projects in DeKalb County, GA, as outlined in General Decision Number GA20260305.
- Sustainability requirements include using recycled content materials and specifying post-consumer recycled content.
- Compliance with HHS EIT accessibility standards (Section 508) is mandatory.
Contact Information
For inquiries, contact Simi Khera at Hkhera@cdc.gov.