Cibola National Forest - Sandia Crest House Demolition & Removal

SOL #: 127EAU26Q0036Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 4
Albuquerque, NM, 871023498, United States

Place of Performance

Cedar Crest, NM

NAICS

Site Preparation Contractors (238910)

PSC

Demolition Of Buildings (P400)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 16, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
May 15, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotations for Demolition and Removal Services of the Sandia Crest House and potentially other structures within the Cibola National Forest, New Mexico. This is a Total Small Business Set-Aside. An amended site visit is scheduled for May 12, 2026, which is mandatory for site access. Quotations are due May 15, 2026.

Scope of Work

The primary scope involves the full demolition, removal, and off-site disposal of the Sandia Crest House structure, including its concrete slab, footings, metal roof, wood decks, and two septic systems. Post-demolition, the site requires restoration to a natural state and installation of a 6-foot chain link privacy fence.

Optional items include:

  • Optional Item #1: Demolition and disposal of two Casa Loma Recreation Residences (Dyer and Del Toro) and associated infrastructure.
  • Optional Item #2: Demolition and disposal of the Lake Marvin recreation building area and eight cabins, including various structural components.

All demolition debris, including identified asbestos-containing materials (ACM) and potential lead-based paint (LBP), must be disposed of at approved licensed facilities in compliance with EPA, OSHA, and NESHAP regulations. Site restoration, noxious weed control, and temporary site enclosure fencing are also required.

Contract Details

  • Type: Request for Quotation (RFQ) for a Firm Fixed Price Purchase Order.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 238910 (Demolition Of Buildings), Size Standard: $19.0 Million.
  • Place of Performance: Primary site at 701 Sandia Crest Rd, Sandia Park, NM 87047. Optional Item #1 sites on Sandia District, Cibola National Forest. Optional Item #2 site near Canadian, TX.
  • Wage Determination: Bernalillo County WD applies, outlining minimum wage rates, health & welfare benefits ($5.55/hr), paid sick leave (EO 13706), and minimum wage (EO 13658).

Key Dates

  • Questions Due: May 8, 2026, 12:00 PM Pacific Time.
  • Mandatory Site Visit: May 12, 2026, 10:00 AM Mountain Standard Time (meet at 91 Casa Loma Rd. Cedar Crest, NM 87008). Email notification required for attendance.
  • Quotations Due: May 15, 2026, 11:00 AM Pacific Time.

Evaluation Criteria

Award will be made to the offeror representing the best value to the Government, based on:

  1. Technical Approach: Ability to meet requirements, demonstrated experience, specific equipment, work schedule, personnel certifications (OSHA), and explanation of unaccomplishable requirements.
  2. Price: Evaluated for fairness and reasonableness.
  3. Past Performance: Demonstrated ability to meet contract requirements (quality, timeliness, cost control, business relations, adherence to terms). Requires a list of three most recent projects.

Additional Information

Offerors must hold prices firm for 90 calendar days. Supporting documents include a Statement of Work, ACM/LBP Survey Report, Geotechnical Evaluation, As-Builts, Floorplans, and Proposed Demolition Fencing.

People

Points of Contact

Vincent GulleyPRIMARY
Scott BeemanSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 14, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 5, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Cibola National Forest - Sandia Crest House Demolition & Removal | GovScope