CCA,BITE CONTROL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Weapon Systems Support Mech, is soliciting quotes for the repair of Circuit Card Assemblies (CCA), BITE Control. This opportunity requires contractors to repair 15 units of NIIN 016256426, ensuring they meet operational and functional requirements. The Government is seeking a Repair Turnaround Time (RTAT) of 365 days, with Government Source Inspection (GSI) required. Offers are due by February 6, 2026.
Scope of Work
The repair work for the CCA, BITE Control (CAGE 53711, Ref. No. 7635990-003 and 8355498) must adhere to the contractor's standard repair practices, manuals, drawings, and technical orders. Items must be marked in accordance with MIL-STD-130, REV N. A critical requirement is that all materials must be mercury-free for use on submarines/surface ships, with strict protocols for any necessary mercury inclusion. Contractors must also comply with MIL-STD-1686 for electrostatic discharge control.
Contract & Timeline
- Type: Solicitation for Repair (RFQ), resulting in a bilateral award.
- Set-Aside: None specified.
- Repair Turnaround Time (RTAT): Target of 365 days from asset return to acceptance. Contractors must state their proposed RTAT and capacity constraints if exceeding 365 days.
- FOB: Origin.
- Freight: Handled by the Navy per Commercial Asset Visibility (CAV) SOW.
- Response Due: February 6, 2026, 8:30 PM UTC.
- Published: January 28, 2026, 8:15 PM UTC.
Submission Requirements
Quotes must include:
- Unit Price and Total Price.
- Proposed Repair Turnaround Time (RTAT) in days.
- Indication of Firm-fixed-Price, Estimated, or Not-to-Exceed (NTE).
- T&E fee/price for Beyond Repair (BR/BER) assets (NTE $_______).
- Awardee CAGE, Inspection & Acceptance CAGE, and Facility/Subcontractor CAGE.
- New unit price and delivery lead-time for comparison.
- Proposed price reduction amount per unit/per month for unexcusable RTAT delays, up to a maximum.
Additional Notes
Only authorized distributors of the original manufacturer's item will be considered for award; proof must be submitted with the offer. Accelerated delivery is encouraged. The contractor is responsible for all inspection requirements and maintaining records for 365 days post-delivery.