CIRCUIT CARD ASSEMB
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, has issued a Request for Quotations (RFQ) for the repair of Circuit Card Assemblies. This solicitation, issued under Emergency Acquisition Flexibilities (EAF), seeks qualified contractors to perform repairs with a required Repair Turnaround Time (RTAT) of 180 days. The quantity has been amended to 172 units. Quotes are due by April 17, 2026.
Scope of Work
This opportunity requires the repair of Circuit Card Assemblies (NSN 7HH 5998-01-256-8665). Contractors must ensure repaired items meet operational and functional requirements as represented by Cage Code 53711 and reference number 6710074-1. All repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings and technical orders. Items must be physically identified in accordance with MIL-STD-130, REV N, and packaging must comply with MIL-STD-2073. Government Source Inspection (GSI) is required.
Contract Details
- Type: Request for Quotations (RFQ) for repair services. The resultant award will be issued bilaterally.
- Duration: One year from the date of order, unless otherwise directed.
- Set-Aside: No specific set-aside is mentioned.
- Response Due: April 17, 2026, by 8:30 PM ET.
- Published: April 15, 2026 (latest amendment).
- Freight: FOB Origin.
- Payment: Wide Area Workflow (WAWF) payment instructions apply.
Submission & Evaluation
Quotes must include the total quote amount and the proposed Repair Turnaround Time (RTAT) in days. If the proposed RTAT exceeds 180 days, contractors must provide capacity constraints. The Government will evaluate offers based on price and past performance, with past performance being more important. Contractors must verify nomenclature, part number, and NSN prior to responding. Proof of being an authorized distributor of the original manufacturer's item is required on company letterhead.
Additional Notes
Accelerated delivery is encouraged. A price reduction will be incurred for unexcusable delays beyond the required RTAT, with the contractor proposing the reduction amount per unit per month, up to a maximum. The RTAT is measured from physical receipt of the F-condition asset at the contractor's facility (as reflected in CAV system) to asset acceptance. Commercial Asset Visibility Repairables Portal (CAV RP) reporting is mandatory. Hazardous material requirements, Unique Item Identification (UII), and marking requirements apply.