CIRCUIT CARD ASSEMB
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Weapon Systems Support Mechanicsburg, is soliciting proposals for the manufacture of a Circuit Card Assembly (Microwave Monitor). This component is critical for the AM-7492/SPY-1D Amplifier, Radio Frequency of the AEGIS Radar System. This solicitation is issued under Emergency Acquisition Flexibilities (EAF) and seeks a Firm-Fixed Price (FFP) award. Responses are due by July 6, 2026.
Scope of Work
The contractor will be responsible for the design, manufacture, and performance of the Circuit Card Assembly, part number 6710334-1 (CAGE 53711), in accordance with specified drawings and requirements. Key responsibilities include:
- Manufacturing the "Circuit Cart Assembly - Microwave Monitor" for the AEGIS Radar System.
- Acquiring or developing the necessary Stable Base Master Phototools (Artwork).
- Physical identification of items per MIL-STD-130.
- Compliance with electrostatic discharge control requirements (MIL-STD-1686).
- Adherence to MIL-STD 2073 for preservation, packaging, packing, and marking.
Contract & Timeline
- Type: Solicitation (Firm-Fixed Price)
- Set-Aside: None specified
- Response Due: July 6, 2026, 8:30 PM UTC
- Published: June 11, 2026
Submission Requirements & Important Notes
- Submission: Electronic quotes, representations, and certifications must be emailed to STEPHANIE.R.PEREZ1@NAVY.MIL.
- Authorized Source: Only authorized sources will be considered. If not the manufacturer, an official letter from the OEM confirming authorized distributor status is required. New supplier approval cannot delay award.
- Quote Details: Submissions must include new procurement unit price, total price, procurement delivery lead time (in days), CAGE, Inspection & Acceptance CAGE (if different), cost breakdown (if feasible), and a quote expiration date (minimum 90 days).
- Quality Assurance: Government Source Inspection is required. The supplier must maintain an inspection/quality system acceptable to the Government, in accordance with MIL-I-45208 or ISO 9001/9002.
- FOB Origin: All freight is FOB Origin.
- Vendor Waivers/Deviations: Any non-compliance with technical requirements or requests for delivery date extensions must be identified as an exception and justified.