CIRCUIT CARD ASSEMB
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support (WSS) Mechanicsburg, is soliciting quotes for the repair of Circuit Card Assemblies (PSC 5998). This opportunity requires contractors to meet specific repair turnaround times (RTAT) and quality standards, including ISO 9001 and Government Source Inspection (GSI). Quotes are due by March 9, 2026.
Scope of Work
This solicitation is for the repair of Circuit Card Assemblies. Key requirements include:
- Repair Turnaround Time (RTAT): A target of 1124 days is specified, measured from asset return to acceptance. Offerors must provide their proposed RTAT and capacity constraints if unable to meet the government's target.
- Quality Standards: Repairs must adhere to ISO 9001 and MIL-STD-130 for physical identification.
- Inspection: Government Source Inspection (GSI) is required. The contractor is responsible for all inspection requirements, with records maintained for 365 days post-delivery.
- Teardown & Evaluation (T&E): Procedures and fees for items determined Beyond Repair (BR/BER) must be quoted.
- Marking & Packaging: Items must be marked per MIL-STD-130 and packaged according to MIL-STD 2073.
- Changes: Specific procedures for design, material, servicing, or part number changes are outlined, requiring Contracting Officer approval.
Contract & Timeline
- Type: Solicitation for Repair Services (Resultant award will be issued bilaterally)
- Set-Aside: None specified
- Response Due: March 9, 2026, 8:30 PM EST
- Published: February 6, 2026
Submission Requirements
Offerors must provide:
- Quote Amount (Unit Price, Total Price)
- Proposed Repair Turnaround Time (RTAT)
- Teardown & Evaluation fee/price (if applicable)
- Awardee, Inspection & Acceptance, and Facility/Subcontractor CAGE codes.
- Proof of being an authorized distributor of the original manufacturer's item, submitted on company letterhead.
Additional Notes
Accelerated delivery is encouraged. All freight is FOB Origin. Freight handling for assets is managed by the Navy per the Commercial Asset Visibility (CAV) Statement of Work. Questions should be directed to the provided Point of Contact.