Circuit Card Assembly
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Ogden, UT has issued a Justification for Other Than Full and Open Competition for the procurement of Circuit Card Assemblies (CCA Theodolite). This justification supports a sole-source acquisition for 18 units, with an estimated value not exceeding $900,000, due to proprietary data and the unavailability of alternative sources.
Purpose & Justification
This document justifies the acquisition of CCA Theodolite (NSN/PN: 6675-01-644-9140) on a sole-source or limited competition basis, citing the statutory authority 10 U.S.C. 3204(a)(1). This authority permits acquisitions when supplies or services are available from only one or a limited number of responsible sources and no other type of supplies or services will satisfy agency requirements.
Scope & Requirements
The requirement is for 18 each of the CCA Theodolite (NSN/PN: 6675-01-644-9140). These are electrical and electronic assemblies, specifically circuit cards (Product Service Code 5998).
Contract Details
- Type: Firm Fixed Price
- Estimated Value: Not exceeding $900,000
- Quantity: 18 units
Eligibility & Set-Aside
This acquisition is restricted to a limited number of sources due to the proprietary nature of the required data. A previous sources sought notice/RFI yielded no responses from industry, indicating that the contractor (BAE) is unwilling to sell its proprietary data or rights, and the agency lacks the engineering capability to reverse engineer the item. Therefore, the acquisition is limited to the only known source capable of furnishing the required supplies.
Additional Notes
This is a justification document, not a solicitation. It outlines the rationale for proceeding with a non-competitive procurement. The approval level for this justification is at the Contracting Officer level, consistent with the estimated value being under $900,000.