CKT BRAKER,NQB-A802
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support (WSS) Mechanicsburg, is soliciting quotations for the repair of CKT BRAKER,NQB-A802. This opportunity, identified as Solicitation N00104-26-Q-LA89, has been amended to extend the quotation submission deadline to June 17, 2026, and to update the required quantity from 1 EA to 2 EA. This is a repair-focused Request for Quotation (RFQ) requiring a 60-day Repair Turnaround Time (RTAT) and Government Source Inspection (GSI).
Scope of Work
The solicitation requires the repair of two (2) units of CKT BRAKER,NQB-A802, ensuring they meet operational and functional requirements as represented by CAGE 30086, Ref. No. ETN359970000C. All repair work must adhere to contractor's standard practices, manuals, and directives, including MIL-STD-130 for marking. Contractors must be authorized distributors of the original manufacturer's item. Key requirements include:
- Repair Turnaround Time (RTAT): 60 days from asset return to acceptance. Contractors must quote their RTAT and explain capacity constraints if unable to meet the 60-day requirement.
- Government Source Inspection (GSI): Required.
- FOB Origin: All freight.
- Testing and Evaluation (T&E): Provisions for T&E fees if an asset is determined Beyond Repair (BR/BER).
- Price Reduction for Delays: A price reduction per unit/per month will be incurred for unexcusable delays beyond the required RTAT, up to a specified maximum.
Contract & Timeline
- Type: Solicitation (RFQ) for repair services, resulting in a bilateral award.
- Product Service Code: 5925 (Circuit Breakers).
- Set-Aside: None specified.
- Response Due: June 17, 2026, 8:30 PM EDT.
- Published: May 28, 2026.
Key Requirements for Quotation
Offerors must provide:
- Quote amount (Unit Price, Total Price).
- Proposed Repair Turnaround Time (RTAT) in days.
- Details on T&E fee/price if an asset is determined BR/BER.
- Awardee CAGE, Inspection & Acceptance CAGE, and Facility/Subcontractor CAGE.
- New unit price and delivery lead-time for comparison.
- Proposed price reduction amount per unit per month for RTAT delays, up to a maximum.
Additional Notes
Contractors are responsible for obtaining applicable documents and adhering to packaging requirements (MIL-STD 2073). Proof of being an authorized distributor must be provided with the offer. Accelerated delivery is encouraged.