CLN AGT,AXAREL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy (NAVSUP WEAPON SYSTEMS SUPPORT MECH) is soliciting proposals for the manufacture of CLN AGT,AXAREL. This opportunity is designated as a Total Small Business Set-Aside. The requirement involves manufacturing to specific drawings, adhering to military standards for marking and configuration control, and implementing robust quality assurance. Proposals are due January 24, 2025.
Scope of Work
This contract requires the manufacture of CLN AGT,AXAREL in strict accordance with specified material and physical requirements, primarily drawing 6237451-001 AXAREL 6100 cage 53711. Key requirements include:
- Manufacturing & Design: Production must conform to drawing 6237451-001 AXAREL 6100 cage 53711.
- Marking: Items must be marked and identified per applicable Military Standards and Specifications, such as MIL-STD-130, MIL-STD-1285, MIL-STD-454, and MIL-P-15024/5.
- Configuration Control: Governed by MIL-STD-973, requiring formal submission of Engineering Change Proposals, Deviations, and Waivers.
- Quality Assurance: The contractor is responsible for all inspection requirements, with the Government reserving the right to perform source inspections as per FAR 52.246-2. Inspection records must be maintained for 365 days post-delivery.
- Packaging: Must comply with MIL-STD 2073 and the contract schedule.
Contract & Timeline
- Type: Solicitation (expected Firm Fixed-Price)
- Set-Aside: Total Small Business
- Proposal Due: January 24, 2025, 9:30 PM ET
- Posted: January 29, 2026 (Note: This date is after the proposal due date, indicating a potential data anomaly or last update date.)
- Delivery: 90 days after contract award.
Evaluation
GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 is required. Award will be based on the Government's acceptance of the contractor's proposal, with no specific evaluation factors beyond compliance detailed in the description.
Additional Notes
This is not an FMS requirement, and contractors are responsible for all shipping expenses to DODAAC locations. Drawings can be accessed and downloaded from SAM.gov by searching the solicitation number. Detailed instructions for ordering referenced documents (e.g., MIL-DTL-31000, DOD-D-1000) from various sources like DODSSP are provided.