Coconino Lookout Tower Cistern Demolition

SOL #: 1153685Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA FOREST SERVICE
WASHINGTON, DC, 20250, United States

Place of Performance

Flagstaff, AZ

NAICS

Site Preparation Contractors (238910)

PSC

Demolition Of Structures Or Facilities (Other Than Buildings) (P500)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 14, 2026
2
Submission Deadline
May 21, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for the Coconino Lookout Tower Cistern Demolition project in Flagstaff, AZ. This Total Small Business Set-Aside opportunity involves the demolition and decommissioning of eight concrete cisterns and the removal of one steel tank across various lookout tower sites within the Coconino National Forest. The primary goal is to enhance public safety.

Scope of Work

The project requires contractors to furnish all personnel, materials, equipment, and services for the complete abandonment of cisterns and removal of a steel tank. Key tasks include:

  • Pumping and demolition of cisterns, followed by backfilling with approved off-site materials, compaction, and site grading.
  • Removal and disposal of an above-ground steel tank, including testing for lead-based paint.
  • Sealing of all top openings on cisterns and regrading surfaces to ensure proper drainage.
  • Removal and lawful disposal of all excess waste from demolition sites.
  • Implementation of noxious weed prevention and control measures.
  • Mobilization and demobilization of resources to remote, rough-access sites.

Contract Details

  • Contract Type: Firm-Fixed-Price.
  • Period of Performance: Work must commence within 10 calendar days after the Notice to Proceed (NTP) and be completed within 180 calendar days of NTP, including final cleanup.
  • Place of Performance: Various lookout tower locations within the Coconino National Forest, Flagstaff, AZ, including Baker Butte, Buck Mountain, East Pocket, Hutch Mountain, Lee Butte, Mt. Elden, Turkey Butte, and Woody Mountain.
  • Restrictions: Work at Lee Butte and Woody Mountain is prohibited from March 1st to August 31st.
  • Set-Aside: This is a 100% Small Business Set-Aside under NAICS code 238910 (Demolition Of Structures Or Facilities (Other Than Buildings)), with a small business size standard of $16.5M.

Submission & Evaluation

  • Proposal Submission Deadline: May 21, 2026, at 3:00 PM Mountain Time.
  • Submission Method: Quotes must be emailed to PPS.proposals@usda.gov.
  • Required Documents: Completed SF 1442, a detailed Price Proposal (using the Schedule of Items), a Technical Proposal outlining approach and past performance, and a Bid Guarantee.
  • Evaluation Criteria: Award will be made to the offeror representing the best value to the Government, based on Technical Approach, Past Performance, and Price. Tradeoffs will not be conducted.
  • Bonds: A bid guarantee is required. For awards exceeding $150,000, 100% payment and performance bonds are mandatory within 10 calendar days after award.
  • Offer Acceptance Period: 60 calendar days from the proposal due date.

Key Dates & Special Requirements

  • Organized Site Visit: April 27, 2026, at 9:00 AM. Contact Kristina Brown for details. Bidders are strongly encouraged to visit sites independently.
  • Requests for Information (RFIs) Due: May 6, 2026, at 3:00 PM Mountain Time. RFIs must be submitted using the provided form to PPS.proposals@usda.gov.
  • Operational Constraints: Contractors must be licensed, comply with all Federal, State, and local regulations (e.g., OSHA, EPA), and adhere strictly to the Coconino National Forest Industrial Fire Precaution Plan Guidelines, which include operational restrictions based on fire danger levels and Red Flag Warnings.
  • Site Logistics: No sanitary services, electricity, or water are available on-site; the contractor must provide these. Cell phone operation is limited. All equipment brought onto the Forest must be thoroughly washed to prevent noxious weed spread.

People

Points of Contact

James EdingtonPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Apr 14, 2026
Coconino Lookout Tower Cistern Demolition | GovScope