Colibrium Additive Maintenance
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is conducting market research through a Sources Sought notice to identify qualified sources capable of providing semi-annual preventive maintenance and technical support for two (2) M2 Additive Manufacturing 3D Printers at Robins Air Force Base, Georgia. This effort aims to ensure the operational readiness of critical additive manufacturing equipment. Responses to the Contractor Capability Survey are due by April 12, 2026, at 11:00 AM EST.
Scope of Work
The requirement includes providing all necessary materials, parts, travel, and labor for:
- Semi-annual preventive maintenance (PM) on two specific M2 3D printers (Serial # M2-900141 and M2-900098) in accordance with Original Equipment Manufacturer's manuals.
- Technical support via telephone or email, available Monday through Friday, 7:00 AM to 7:00 PM.
- Corrective maintenance/repairs, requiring written estimates within three business days of assessment.
- Addressing "Over and Above Work" within the general scope, subject to negotiation and contract modification.
- Potential needs include repair of existing systems/equipment in a depot environment and configuration management for parts obsolescence.
Contract & Timeline
- Type: Sources Sought / Market Research
- Set-Aside: No set-aside decision has been made at this stage. The final strategy will be determined after analysis of responses. Both large and small businesses, including joint ventures and teaming arrangements, are encouraged to participate.
- Response Due: April 12, 2026, 11:00 AM EST
- Published: March 16, 2026
- Place of Performance: Robins Air Force Base, Warner Robins, GA 31098.
Evaluation
Responses will be used to assess industry capabilities and determine the appropriate acquisition strategy, including potential small business participation. Interested contractors must provide documentation supporting their company's capability to meet the requirements by completing the Contractor Capability Survey (Parts I and II).
Additional Notes
A draft Performance Work Statement (PWS) is available for detailed requirements. Questions regarding this market survey should be directed to Joshua Sharpe (joshua.sharpe.6@us.af.mil) or Traci Chance (traci.chance@us.af.mil). Responses should be sent via email to both contacts, with attachments not exceeding 10 MB per email.