COMPRESSOR HP
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH is issuing a Solicitation for the repair of COMPRESSOR HP (Product Service Code: 4310 - Compressors And Vacuum Pumps). This opportunity is issued under Emergency Acquisition Flexibilities (EAF), encouraging accelerated delivery. Quotes are due by April 17, 2026.
Scope of Work
This solicitation requires the repair of COMPRESSOR HP units, ensuring they meet operational and functional requirements as represented by CAGE Code 1KWT0 and reference number 085174-2. All repair work must adhere to the contractor's standard practices, manuals, and approved repair standards. A Repair Turnaround Time (RTAT) of 90 days is required, measured from asset physical receipt to acceptance. Government Source Inspection (GSI) is mandatory. Contractors must verify nomenclature, part number, and NSN before responding. Freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
Contract & Timeline
- Type: Solicitation for Repair (bilateral award requiring contractor acceptance)
- Set-Aside: None specified
- Response Due: April 17, 2026, 8:30 PM UTC
- Published: April 2, 2026
- FOB Origin for all freight.
Quote Requirements
Quotes must include:
- Unit Price and Total Price.
- Repair Turnaround Time (RTAT) in days. If not meeting 90 days, provide capacity constraints.
- Testing and Evaluation (T&E) fee/price if an asset is determined Beyond Repair (BR/BER), with a Not-to-Exceed (NTE) amount to be negotiated.
- Awardee CAGE, Inspection & Acceptance CAGE, and Facility/Subcontractor CAGE.
- New unit price and delivery lead-time for comparison.
Additional Notes
Failure to meet the required RTAT will incur a price reduction per unit/per month of delay, up to a specified maximum, unless the delay is excusable. This does not limit other government remedies. Annual Representations and Certifications (MAR 2025) and Buy American clauses apply. Contact Jaclyn I. Phillips at jaclyn.i.phillips.civ@us.navy.mil or 717-605-2984 for inquiries.