Computer System
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Ogden, UT is soliciting quotations for two Computer Systems (NSN 7010-01-705-5751). This acquisition is restricted to qualified source(s): Northrup Grumman CAGE 1L4J7. Quotations are due by April 17, 2026.
Scope of Work
This Request for Quotation (RFQ) is for the procurement of:
- Item No. 0001: Two (2) each of "COMPUTER SYSTEM, DIG" (NSN: 7010-01-705-5751 FD), requiring Item Unique Identification (IUID).
- Item No. 0002: One (1) Not Separately Priced (NSP) item, requiring a Counterfeit Prevention Plan.
All items require marking in accordance with MIL-STD-130 and MIL-STD-129/ASTM-D-3951 for packaging and container marking. Supply chain traceability documentation is also required. The effort emphasizes On-Time Delivery (OTD) improvement.
Contract Details
- Contract Type: Firm Fixed Price for Item No. 0001.
- Pricing: Offered prices must be held firm for 120 days.
- Delivery: Item No. 0001 by March 7, 2028; Item No. 0002 within 30 calendar days after contract award.
- F.O.B.: Origin for Item 0001, Destination for Item 0002.
- Payment: Via Wide Area WorkFlow (WAWF).
Eligibility & Set-Aside
This is not a Small Business Set-Aside. The acquisition is restricted to qualified source(s): Northrup Grumman CAGE 1L4J7.
Submission & Evaluation
- Quotations Due: April 17, 2026.
- Evaluation: Primarily based on Price or Cost, with other factors being significantly less important.
- Mandatory Deliverable: A Counterfeit Prevention Plan (CDRL A005) is required within 30 days of contract award, adhering to section 3 of SAE AS5553. This plan is crucial for ensuring the integrity of parts and materials.
- Packaging: Extensive military packaging requirements apply, including adherence to MIL-STD-2073-1, MIL-STD-129, and hazardous materials regulations (e.g., ICAO, CFR Title 49).
Contact Information
For inquiries, contact Scottina Malia at scottina.malia@us.af.mil.