Condenser Water Box and Tubesheet Protective Coating – Building 450

SOL #: 6-B175-Q-00172-00Solicitation

Overview

Buyer

Energy
Energy, Department Of
ARGONNE NATL LAB - DOE CONTRACTOR
Lemont, IL, 60439, United States

Place of Performance

Place of performance not available

NAICS

Painting and Wall Covering Contractors (238320)

PSC

Air Conditioning Equipment (4120)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 23, 2026
2
Last Updated
Feb 26, 2026
3
Submission Deadline
Mar 2, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Argonne National Laboratory is soliciting proposals for Condenser Water Box and Tubesheet Protective Coating Services for Building 450. This opportunity seeks a contractor to provide long-term corrosion protection for internal surfaces of water-cooled chiller components. Proposals are due by March 02, 2026, at 5:00 PM CST.

Scope of Work

The selected contractor will furnish all labor, supervision, engineering, materials, equipment, containment systems, waste disposal, quality control, and incidentals to protect three (3) water-cooled chiller condenser water boxes, tubesheets, and heads in Building 450. The work involves:

  • Internal surface preparation, including abrasive blasting to SSPC-SP10 / NACE No. 2 minimum.
  • Surface restoration to repair pitting and irregularities using epoxy.
  • Application of a two-coat high-build immersion-rated coating system with a minimum total dry film thickness (DFT) of 20 mils.
  • Conducting inspections (DFT readings, holiday detection, defect repair) and providing comprehensive documentation.
  • Proposed coating systems must meet performance requirements, with no proprietary products specified.
  • Work is to be performed by the contractor's direct employees; subcontracting is not preferred.

Contract & Timeline

  • Type: Solicitation (Request for Quotation)
  • Set-Aside: None specified
  • Response Due: March 02, 2026, 5:00 PM CST
  • Questions Due: February 25, 2026, 12:00 PM CST
  • Published: February 23, 2026
  • Place of Performance: Building 450, Argonne National Laboratory, Lemont, Illinois.
  • Performance Period: To be completed after Notice to Proceed, coordinated with Laboratory outage scheduling.

Submission Requirements & Special Conditions

Bidders must submit a comprehensive proposal addressing the following:

  • An executed ANL-70 Request for Quotation (signed on Page 1).
  • A proposal with pricing quoted in USD, confirming all costs are incorporated for a total price.
  • A completed ANL-70B Representation and Certifications (Long Version) form, including business organization details, small business classifications, NAICS code, and various FAR clause certifications.
  • A Certificate of Insurance.
  • Review and acceptance of the ANL-71 COM Terms and Conditions, which detail standard contractual clauses including cybersecurity, disputes, and site access.
  • Review and acceptance of the ANL-366H Supplemental Onsite Terms, which outline stringent "High Risk" requirements for work at Argonne, covering indemnity, mandatory insurance (General Liability, Auto, Professional, Worker Comp), extensive Environment, Safety, and Health (ES&H) compliance (e.g., 10 CFR 851, OSHA, Job Safety Analysis), site access protocols, and a disciplinary program.
  • Review of the Statement of Work (SOW).
  • Applicators must be manufacturer-trained or certified, and a minimum five (5) year performance warranty against coating failure is required.
  • Pre-mobilization submittals (work plan, coating data sheets, SDS, QC plan) and deliverables (daily reports, final completion report, warranty certificate) are mandatory.

People

Points of Contact

Jenna Doria-GarnerPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 2
Solicitation
Posted: Feb 26, 2026
View
Version 1Viewing
Solicitation
Posted: Feb 23, 2026