Construct 241st Security Measures

SOL #: W50S9826BA002Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7N1 USPFO ACTIVITY TNANG 134
MCGHEE TYSON ANG BASE, TN, 37777-6227, United States

Place of Performance

Chattanooga, TN

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 11, 2025
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 6, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is soliciting bids for the Construct 241st Security Measures project in Chattanooga, TN. This Total Small Business Set-Aside opportunity involves comprehensive construction services to enhance base infrastructure and security for the 241st Engineering and Installation Squadron. The project magnitude is estimated between $750,000 and $2,000,000. Bids are due May 6, 2026, at 2:00 PM EDT and must be hand-carried.

Scope of Work

The project aims to provide a safe, functional, and secure Air National Guard facility and compound by addressing substandard security controls at the existing vehicle entry gate and perimeter fencing. Key tasks include:

  • Installation of new iron picket perimeter security fence with masonry posts.
  • Removal and repair of existing chain link fence, including filling holes.
  • Demolition of existing gate operators and concrete islands.
  • Saw cutting pavement and patching.
  • Installation and/or modification of conduit for power and communications wiring.
  • Installation of a new motor-operated access-controlled main gate and associated security components for a complete system.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP).
  • Period of Performance: 365 calendar days after Notice to Proceed (NTP), with performance to begin within 30 calendar days of NTP.
  • NAICS Code: 236220 - Commercial and Institutional Building Construction.
  • Small Business Size Standard: $45,000,000.
  • Liquidated Damages: $608.93 per calendar day of delay.

Submission & Evaluation

  • Bid Due Date: May 6, 2026, at 2:00 PM Eastern Daylight Time.
  • Submission Method: Bids must be hand-carried; facsimile or electronic offers will not be accepted. Submit an original and one copy.
  • Evaluation Criteria: Award will be made to the responsible bidder whose bid conforms to the invitation for bids and is most advantageous to the Government, considering only price and price-related factors. The Government intends to award without discussions.
  • Pre-Bid Conference: A pre-bid conference and site visit were held on April 1, 2026.
  • Required Documents: SF 1442 (signed), priced Section 00 10 00 Line Items, valid Bid Bond (SF 24) (20% of contract value or $3,000,000, whichever is less), Section 00 45 00 Representations and Certifications, and acknowledgment of all amendments.
  • Registration: Offerors must be registered in the System for Award Management (SAM.gov).

Key Requirements & Clarifications

  • Amendments: Amendment 2 incorporated responses to 107 vendor questions, updated specifications for Unit Masonry Assemblies (04 22 00) and Communications Rough In (27 01 10), and included a Geotechnical Report.
  • Geotechnical: The Geotechnical Report details site conditions, potential hazards (e.g., sinkhole potential), and recommendations for site preparation and foundation design. Bidders should account for a contingency of 50 CY for subgrade removal and replacement with compacted crushed stone if subgrade fails.
  • Quality Control: A Quality Control Plan (QCP) is required within 10 days of award.
  • Access & Security: Compliance with installation access and security policies, including background checks and Antiterrorism Awareness Level I training, is mandatory for all personnel.
  • Permits: The Government will manage environmental permits; no permits are required for electrical/low voltage rough-in and gate operator reconnection.

Contact Information

For questions, contact Brian Morelock at brian.morelock.1@us.af.mil or 865-336-3341.

People

Points of Contact

Brian MorelockPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Solicitation
Posted: Apr 29, 2026
Version 5
Solicitation
Posted: Apr 21, 2026
View
Version 4
Solicitation
Posted: Apr 1, 2026
View
Version 3
Pre-Solicitation
Posted: Mar 20, 2026
View
Version 2
Solicitation
Posted: Mar 20, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 11, 2025
View
Construct 241st Security Measures | GovScope