Construct New Bulkhead, Hugo Lake, Oklahoma

SOL #: W912BV26RA011Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W076 ENDIST TULSA
TULSA, OK, 74137-4290, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Dams (Z2KA)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 13, 2026
2
Last Updated
Mar 16, 2026
3
Response Deadline
Feb 28, 2026, 8:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers, Tulsa District, has issued a Presolicitation Notice for the construction of a new segmental bulkhead assembly at Hugo Lake, Oklahoma. This project, anticipated to be a Design Bid Build, Firm Fixed Price contract, is under Full and Open Competition. The Request for Proposal (RFP) is expected to be released in late February 2026. Interested parties must monitor SAM.gov for the official solicitation.

Scope of Work

The primary scope involves the fabrication, shipment, field assembly, and testing of a new segmental bulkhead assembly. This includes the construction of an incidental crane pad. The bulkhead assembly will consist of six individual hollow steel tubular segments, each approximately 51 feet long. These segments will be assembled in the reservoir to form a single floating bulkhead designed to block water flow through tainter gate bays during inspection and maintenance. The floating bulkhead will be ballasted with water using mechanical pumps and rotated to a vertical orientation for placement. The design allows for assembly and disassembly in the water, with segments removable for out-of-water storage when not in service.

Optional Work: Removal and disposal of the existing bulkhead assembly.

Contract & Timeline

  • Opportunity Type: Presolicitation Notice
  • Contract Type: Design Bid Build, Firm Fixed Price
  • Product Service Code (PSC): Z2KA (Repair or Alteration of Dams)
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction)
  • Size Standard: $45,000,000.00
  • Estimated Magnitude: Between $5,000,000.00 and $10,000,000.00
  • Set-Aside: Full and Open Competition
  • RFP Expected Release: On or about late February 2026
  • Notice Published: February 13, 2026
  • Place of Performance: Hugo Lake, Oklahoma, with final delivery of bulkhead segments within approximately five miles of 3107 US Hwy 70 E, Sawyer, Oklahoma 74756.

Additional Notes

This notice is for informational purposes only and does not constitute a request for proposal. The solicitation will be offered in electronic format only via SAM.gov. Offerors are responsible for periodically checking SAM.gov for the RFP and any amendments. Prospective offerors MUST be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM to participate in this procurement. No reimbursement will be made for costs associated with responding to this synopsis.

Contact: Shawn G. Brady (shawn.g.brady@usace.army.mil, 918-669-4984)

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 3
Solicitation
Posted: Mar 16, 2026
View
Version 2
Solicitation
Posted: Mar 13, 2026
View
Version 1Viewing
Pre-Solicitation
Posted: Feb 13, 2026
Construct New Bulkhead, Hugo Lake | GovScope