Construct Pathway Sunset Liberty March

SOL #: W912HN25BA023Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W074 ENDIST SAVANNAH
SAVANNAH, GA, 31401-3604, United States

Place of Performance

Fort Bragg, NC

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Recreation Facilities (Non Building) (Y1PA)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 18, 2025
2
Last Updated
Sep 18, 2025
3
Response Deadline
Sep 30, 2025, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The U.S. Army Corps of Engineers (USACE) Savannah District intends to issue an Invitation for Bids (IFB) for W912HN25BA023 for Project Number: 103972, Construct Pathway Sunset Liberty March, Fort Bragg, NC. This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming; no proposals are being accepted. The subsequent solicitation will result in a C-Type Stand-alone contract.  This Invitation for Bids will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industry Classification System (NAICS) code is 237990 – Other Heavy and Civil Engineering Construction, with a Small Business size standard of $45M.         Description of Work: This is a new requirement to construct a pathway Sunset Liberty March. The project will convert abandoned sections of Bragg Boulevard to a memorial pathway, highlighting the significant contributions of the US Army units stationed in the installation. The project includes the demolition of the bituminous layer and installation of a new memorial pathway on top of the existing concrete sub-base. The pathway will include lights, memorial markers, planting and will terminate in a new memorial plaza. Supporting facilities include exterior electric service, security lighting, paving, signage, storm drainage, erosion control, and landscaping. This project is fully designed, and all technical specifications and drawings will be provided at the issuance of the Solicitation.

Link to PIEE : https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912HN25BA023&noticeType=Presolicitation

People

Points of Contact

Files

Files

Download

Versions

Version 2
Pre-Solicitation
Posted: Sep 18, 2025
View
Version 1Viewing
Pre-Solicitation
Posted: Sep 18, 2025
Construct Pathway Sunset Liberty March | GovScope