Construction of a Spur Jetty at Camp Ellis Beach in Saco, Maine

SOL #: W912WJ26BA004Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW ENGLAND
CONCORD, MA, 01742-2751, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Oct 17, 2025
2
Last Updated
Jan 22, 2026
3
Submission Deadline
Nov 18, 2025, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The U.S. Army Corps of Engineers, New England District is issuing an Invitation for Bids for construction of a spur jetty that will be tied into the existing North Jetty located at the mouth of the Saco River at Camp Ellis Beach in the City of Saco, Maine. The NAICS code for this procurement is 237990 with a size standard of $45M. The estimated construction cost is between $10,000,000 and $25,000,000.The existing North Jetty at Camp Ellis Beach is an interlocked stone structure located at the entrance to the Saco River. Originally constructed in 1872, the structure has been lengthened and repaired numerous times over the years. The existing North Jetty is approximately 6,600 feet in length and constructed to a height of 15 feet MLW with an 8-ft crown width. Side slopes are 1H:1V. The proposed jetty spur will extend from the existing North Jetty into Saco Bay.The proposed work consists of constructing a 750-ft long spur jetty extending from the North Jetty into the Saco Bay at a location approximately 1500? from shore. As part of the spur jetty construction, the Contractor will reinforce an approximately 100-ft length of the North Jetty. The work includes mobilization and demobilization, the furnishment and delivery of stones, removal/rehandling/resetting of existing stones, and placement of new bedding, underlayer and armor stone for tie-in between the new and the existing structure. Anticipated stone required to construct the spur jetty and reinforce the existing north jetty includes approximately 9,500 square yards of 2-ft thick, stone-filled marine mattress; 13,000 tons of underlayer stone; and 38,000 tons of 8-12 ton armor stone (36,000 tons for the spur and 2,000 for the existing jetty reinforcement.) The reinforcement work will require substantial moving and rehandling of existing stones to obtain the required interlocking placement and construction tolerances. Construction, stone delivery, and access will be by water. Access to the breakwater by land is unavailable and no work should be completed from the crest of the breakwater. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. Low tide water depths in the vicinity of the structure are approximately 10 feet, and the average tidal range is approximately 9 feet. The area is located 1500? off the shoreline and subject to wave action. No spudding or anchoring into the existing structure is permitted.Please note that this solicitation is unrestricted. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at brian.t.mannion@usace.army.mil

People

Points of Contact

Files

Files

Download
View
View
View
View

Versions

Version 4
Award Notice
Posted: Jan 22, 2026
View
Version 3Viewing
Solicitation
Posted: Dec 3, 2025
Version 2
Solicitation
Posted: Oct 29, 2025
View
Version 1
Solicitation
Posted: Oct 17, 2025
View