Construction of F16 Mission Training Center
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The NJ National Guard intends to issue a Request for Proposal (RFP) for the Construction of the F-16 Mission Training Center at the 177th Fighter Wing in Egg Harbor Township, NJ. This is a presolicitation for a single firm fixed-price contract, 100% set aside for Small Businesses, with a magnitude exceeding $10,000,000. The tentative solicitation release is May 1, 2026.
Scope of Work
The project requires all plant, labor, materials, and supervision for the construction of the F-16 Mission Training Center. This includes base work and several option line items:
- OLI 1: 33 New Parking Spaces
- OLI 2: South Parking 77 New Spaces
- OLI 3: Masonry Veneer
- OLI 4: Entry Monolith
- OLI 5: Mechanical Yard Masonry Wall
- OLI 6: Concrete Surface Mechanical Yard
- OLI 7: Add Sign
- OLI 8: Add Concrete Support Simulator
Contract & Timeline
- Type: Single Firm Fixed-Price Contract
- Duration: 425 calendar days after Notice to Proceed
- Set-Aside: Total Small Business (100%)
- NAICS: 236220 (Small Business Size Standard: $45,000,000)
- Magnitude: Over $10,000,000
- Tentative Solicitation Release: On-or-about May 1, 2026
- Tentative Pre-proposal Conference: On-or-about May 13, 2026, 1:30 PM local time (site visit to follow)
- Pre-proposal Questions Due: May 21, 2026 (via email to 177fw.contracting.org@us.af.mil)
- Tentative Solicitation Closing: On-or-about June 2, 2026
Evaluation Factors
Award will be based on Technical Capability, Past Performance, and Price. The Government intends to award without conducting discussions.
Important Information
Offerors must be registered in the System for Award Management (SAM) at www.SAM.gov. Attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), which limits subcontracting to non-similarly situated entities to 85% of the contract amount (excluding materials). Official plans and specifications will be available on SAM.gov, and offerors are responsible for monitoring the site for amendments.