Construction Of The Athletic Complex, Minot AFB, ND
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers, Omaha District, is conducting market research via a Sources Sought Notice for the Construction of an Athletic Complex at Minot AFB, ND. This notice aims to identify qualified prime construction contractors with a bonding capability of at least $5M. The project involves constructing outdoor athletic and recreational areas. Responses are due by 2:00 PM CST, May 15, 2026.
Scope of Work
The project entails the construction of a new consolidated Athletic Complex, including associated site work, infrastructure, and systems. Key components include:
- Two (2) softball fields
- One (1) multi-sports (soccer) field
- Dugouts, sidewalks, concrete pads, and fencing
- Ballfield lighting and electrical utility connections
- Grading and seeding
- The construction footprint is less than 15 acres.
- No vertical construction (buildings) or demolition work is included.
- The facility will be designed as permanent construction per DoD UFC 1-200-01.
Contract & Timeline
- Type: Sources Sought (Market Research)
- Project Delivery: Design-Bid-Build (DBB)
- Magnitude of Construction: Between $2M and $5M
- Period of Performance: 550 calendar days from Notice to Proceed (NTP)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 237990 - Other Heavy and Civil Engineering Construction
- Response Due: 2:00 PM CST, May 15, 2026
- Published: April 17, 2026
- Anticipated Award: Fiscal Year 2027 (between Q2 and Q4)
Submission Requirements
Interested prime contractors must submit a narrative (max 12 pages) demonstrating experience in similar construction projects. Responses should include:
- Company details (name, address, POC, phone, email)
- CAGE Code and UEI number
- Business size and teaming arrangements
- Details of similar projects (prime/sub, start/end dates, references, cost, term, complexity)
- Bonding capability (single and aggregate performance/payment bonds)
- Experience with recreational sports facilities and DoD military installations within the last 10 years, with an approximate value of $5M.
Additional Notes
This is for market research only; it is not a request for proposal. Cybersecurity Maturity Model Certification (CMMC) is not applicable.