Construction of the Pavement Performance Test Facility Laboratory at the Turner-Fairbank Highway Research Center
SOL #: 693JJ319Q000094Combined Synopsis/Solicitation
Overview
Buyer
Transportation
Federal Highway Administration
693JJ3 ACQUISITION AND GRANTS MGT
WASHINGTON, DC, 20590, United States
Place of Performance
MCLEAN, VA
NAICS
Prefabricated Metal Building and Component Manufacturing (332311)
PSC
Prefab Structures/Scaffolding (54)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Aug 22, 2019
2
Last Updated
Aug 28, 2019
3
Submission Deadline
Sep 2, 2019, 2:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Amendment: Update quotation due date and add question cutoff date.
The purpose of the contract is construct a pre-engineered steel building at the Tuner-Fairbank Highway Research Center in McLean, Virginia. The steel building will be between 26 ft wide,70 ft long, with a wall height between 14-16 ft and a roof pitch between 4:12 and 2:12. The building will be insulated, with 4-exterior doors, 10-windows, and 2-roll-up garage doors,12x12 ft. and 9x 8 ft. An inside area of the building will be framed with finishing to make an office, bathroom, and small electronics shop with HVAC for the partitioned areas. See Attachment for detail requirement.
People
Points of Contact
Megan M. MavisContract SpecialistPRIMARY
Files
Versions
Version 2
Combined Synopsis/Solicitation
Posted: Aug 28, 2019
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Aug 22, 2019